| Automotive Parts & Accessories |
| Company | Project Description |
| AC Delco Systems | Improving Efficiency of Hot and Cold Press Areas |
| AEG Aktiengesellschaft | Phase I: Feasibility Study/New Plant for Mobile Telephone Production |
| AEG Aktiengesellschaft | Technical Concept Design for a Green Field Factory for Stationary Turbine Parts/Steam & Gas |
| AEG Aktiengesellschaft | Critical Analysis for Low Cost Factory for High Voltage Switch Gear |
| AEG Aktiengesellschaft | Critical Analysis for Low Cost Factory for High Voltage Switch Gear |
| AEG Aktiengesellschaft | Planning of Low Cost Factory for High Voltage Brakes |
| AEG Aktiengesellschaft | Overall Organization Structure of Low Cost Factory |
| AEG Aktiengesellschaft | CAD/CAM Project Within Planning of Low Cost Factory for High Voltage Equipment |
| AEG Aktiengesellschaft | Organization and Implementation of Low Cost Factory for High Voltage Switch Gear |
| AEG Aktiengesellschaft | High Rise Storage Organization for Low Cost Factory for High Voltage Valves |
| AEG Aktiengesellschaft | Workshop: Organization and Implementation of Low Cost Factory |
| AEG Aktiengesellschaft | Workshop: Technical Planning and Routing |
| AEG Aktiengesellschaft | Calculation of Low Cost Factory Economics |
| Air Gage Company | Improvement Program |
| Air Gage Company | Improvement Program (Continued Assistance) |
| Air Gage Company | Improvement Program (Continued Assistance) |
| Air Gage Company | Improvement Program (Continued Assistance) |
| Allevard Industries (Allevard Rejma) | Feasibility Study - Manufacture of Composite Spring Eyes |
| Allied Automotive (Bendix Commercial Vehicle Systems) | Material Handling Plan - Brake Manufacturing |
| AlliedSignal Inc. | Critical Analysis |
| AlliedSignal Inc. | Strategic Planning for the 1990s |
| Amcast Industrial Corporation | Pre-Investment Facility Evaluation |
| Amcast Industrial Corporation | Critique Machining Methods |
| Amcast Industrial Corporation | Review Slot Location Problem |
| Amcast Industrial Corporation | Evaluate Proposed Gas City Plant Layout Through Simulation |
| American Bosch (AMBAC International) | Feasibility Analysis and Planning for New Diesel Engine Auto. Injector Pump (Mfrability.) |
| American Bosch (AMBAC International) | Facility Relocation Planning |
| American Bosch (AMBAC International) | Injector Manufacturing Feasibility Study |
| American Bosch (AMBAC International) | Evaluate Manufacturing Capability at the AMBAC BV Facility Located in Breda, Holland |
| American Bosch (AMBAC International) | Fuel Injection System Planning |
| AP Parts (Merit Exhaust Systems) | Productivity Improvement |
| Armstrong Equipment Plc (Monroe) | Redesign of Business |
| Armstrong Shock Absorbers (Monroe) | Critical Analysis of Warehouse |
| Arvin Industries, Inc. (ArvinMeritor) | Layout Critique for TRW Cell |
| Arvin Industries, Inc. (ArvinMeritor) | Implementation Planning and Assistance |
| Arvin Industries, Inc. (ArvinMeritor) | Review and Develop Layout Concept For West Building |
| ArvinMeritor | Lean Implementation |
| ArvinMeritor, Off-Hwy. Prod. & Sys. | Facilities/Product Rationalization and Consolidation |
| ArvinMeritor, Off-Hwy. Prod. & Sys. | Facilities/Product Rationalization and Consolidation |
| Atwood Mobile Products | Planning Utilization of New Building |
| Atwood Mobile Products | Plant Consolidation to Reduce Overhead Costs |
| Atwood Mobile Products Div. | Review and Critique Engineering Design of New Gear Train Transmission |
| Auto Specialties Mfg. Co. (AUSCO) | Plant Layout |
| Auto Specialties Mfg. Co. (AUSCO) | Plant Layout |
| Auto Specialties Mfg. Co. (AUSCO) | Continuation of Plant Layout Implementation |
| Automotive Products Plc | Preliminary Survey - Transmission Division |
| Automotive Products Plc | Heat Treatment Investment/Detailed Evaluation Comparison Italy Versus U.K. |
| Automotive Products Plc | Heat Treatment Investment Appraisal |
| Automotive Products Plc | Strategy for JIT Manufacture |
| Automotive Products Plc | Short-Term Improvements |
| Automotive Products Plc | Project Liaison and Management |
| Balcrank Products | Critical Analysis - Manufacturing |
| Berliet Maroc (Renault) | Feasibility Study - Foundry and Engine Plant |
| Bharat Gears Limited | Overview of New Gear Shop Planning |
| BMW Motorsport Gesellschaft | Simulation of New Transfer Engine Block Line With 141 Stations - SR in German |
| BorgWarner | Phase II: Operational Improvements |
| BorgWarner | Operational Improvements (Improving Margin Performance of Bonders) |
| BorgWarner | Phase I: Operational Analysis |
| BorgWarner | VCT Manufacturing Cost Assessment |
| Borg-Warner Australia Ltd. | Feasibility Study to Merge Manufacturing Facilities |
| Borg-Warner Australia Ltd. | Assistance in Merging of Manufacturing Facilities |
| Borg-Warner Automotive Inc. | Streamlining the 1356 Case Production Line |
| Borg-Warner Automotive Inc. | Facilities Utilization Planning |
| Borg-Warner Corporation | Manufacturing Process Study of U-Joints |
| Borg-Warner Corporation | Feasibility Study for CV Joint Manufacture |
| Bosch Group | Lean Six Sigma Overview Workshop |
| Bryant Manufacturing Pty. Ltd. (Viking Equipment) | Design Assembly Facility |
| Bryant Manufacturing Pty. Ltd. (Viking Equipment) | Layout for New Factory on Green Field Site |
| Budd Company (Thyssen Krupp Budd) | Cutting Tool Study - Toolroom |
| Budd Company (Thyssen Krupp Budd) | Technical Assistance With Tooling |
| Budd Company (Thyssen Krupp Budd) | New Facilities Planning for Manufacture of Auto Brake Drums |
| Budd Company (Thyssen Krupp Budd) | Project Sam - Brake Drums |
| Burrafirm Ltd. | Study Design of Door Retainer for Tractor and Excavator Cabs |
| BWP Controls Ltd. | Design Study on a Cable-Operated Gear Changer for Cars |
| Carl Schenck AG | Critical Analysis of the Production Logistics for a Multi-Purpose One-of-a-Kind Machine Builder |
| Carter Automotive Co. Inc. (Federal Mogul) | Plant Consolidation Planning |
| Champion Spark Plug Europe S.A. | Cost System Analysis (Concepts and Implementation) |
| Champion Spark Plug Europe S.A. | Consolidated Facilities Plan - Europe |
| Champion Spark Plug Europe S.A. | Production Operations Overview |
| Chicago Rawhide Mfg. Co. (Acquired by SKF) | Critical Analysis of Chicago Raw Hide as a Business Enterprise |
| Clayton Dewandre Co. Ltd. | Critique of Manufacturing Plan |
| Clearplas Ltd. (Key UK) | Feasibility of Automating Power Handling, Finishing and Assembly |
| Climax Parts & Service | Evaluation of Quality Function to Comply with BS5750 |
| Cosworth Engineering (Acquired by Mahle Powertrain) | Feasibility Study for Implementation of FMS for Cylinder Heads and Components |
| Crown Division | New Facility Audit |
| Dana Corporation | A&D: Inventory & Auxiliary Warehouse Requirements |
| Dana Corporation | A&D of Hydroforming Operations in Elizabethtown, KY |
| Dana Corporation | Operational Improvement Program |
| Dunlop Automotive | Bonus Scheme Evaluation |
| Eaton Corporation | Assistance With Upgrading Fletcher Factory |
| Eaton Corporation | Assist in Developing an Upgraded Plant Layout |
| Eaton Corporation | Detailed Engineering Work for Production System |
| Eaton Corporation | Detailed Work Schedule for Supercharger Project |
| Eaton Corporation | Detailed Engineering Work |
| Eaton Corporation | Critique Resource Planning |
| Eaton Corporation | Assistance With Supercharger Resource Planning |
| Eaton Corporation | Assist in Formulating Resource Strategy |
| Eaton Corporation | Consolidation Plan for Air Products Div. to Reduce Manufacturing Costs Incl. Implementation Schedule |
| Eaton Corporation | Develop a Plan for Producing Ford “Modular” Engine Components |
| Eaton Corporation | Critical Analysis of Turning Tooling |
| Federal-Mogul | Validating the Current Rationalization Plan |
| Fiat Veicoli Industrial | Diesel Test Review |
| Firestone Tire & Rubber Co. (Bridgestone) | Concept Design of Equipment to Automate Drum Movement |
| Firestone Tire & Rubber Co. (Bridgestone) | New Process Line for Assembling Radial Truck Tires |
| Fleetguard Nelson | Assessment and Design for Plastic Injection Molding |
| Fleetguard Nelson | Implementation of Layout |
| Fleetguard Nelson | Moving ATV & ERT Lines to Wautoma Facility |
| Fleetguard Nelson | Implementation of ATV Muffler and Frame Lines Start-Up at Waynesboro, GA |
| Fleetguard Nelson | A&D of ATV Muffler and Frame Lines Start-Up at Waynesboro, GA |
| Fleetguard Nelson | Injection-Molding Line Installation |
| G & O Manufacturing Company (Proliance International) | Implementation of Department 12 - Advisory Assistance |
| G & O Manufacturing Company (Proliance International) | Implementation of Phase I: Findings Manufacturing Improvements |
| G & O Manufacturing Company (Proliance International) | Strategic Plan and “Quick Hitters” |
| G & O Manufacturing Company (Proliance International) | Completed Project 63861 at Client Request |
| Garrett Airsearch Ltd. | DTI/Product Cost Analysis |
| Gebr. Wackenhut GmbH (AHG Wackenhut) | Rahmenkonzept fur di Zukunft von Wackenhut |
| GECOM | Inventory Accuracy Design and Pilot |
| GECOM | Phase III: Inventory Accuracy Full Implementation |
| GKN Axles Ltd. (gKN plc) | Assistance With Developing a Manufacturing Strategy |
| GKN Axles Ltd. (gKN plc) | Detailed Planning and Implementation of the Manufacturing Strategy for Heavy Axles |
| GKN Axles Ltd. (gKN plc) | Jaguar Task Force Improvement Program |
| GKN Axles Ltd. (gKN plc) | Management Training |
| GKN Contractors Ltd. | Assistance with Proposed Axle Plant - East Germany |
| GKN Contractors Ltd. | Axle Project Assistance to East Germany |
| GKN Shardlow Ltd. | Assistance With Implementation of Crankshaft Machining Facility |
| GKN Shardlow Ltd. | Tender Evaluation and Order Placement of Machining Centers |
| GKN Shardlow Ltd. | Simulation of FMS for Crankshaft Manufacture |
| Goodyear | Lean Implementation |
| Goodyear Tire & Rubber | Lean Implementation |
| Goodyear Tire & Rubber | Analysis & Implementation Design |
| Goodyear Tire & Rubber | APT Videotape Training Course |
| Hastings Manufacturing Company | Profit Improvement Plan |
| Hellman Co. | Evaluate Proposed Acquisition of In-Process Gaging Manufacturing Company in Livonia, MI |
| IMI Radiators Ltd. (DENSO) | New Facility for Commercial Vehicle Radiators |
| Johnson Controls Inc. | Phase I: Critical Analysis of HVAC Baffle Manufacture |
| Kelsey-Hayes Company | Valve Body Machining Process Study |
| Kelsey-Hayes Company | Critique of Machining Operations |
| Kelsey-Hayes Company | A New Factory Plan for a $20 Million to $30 Million Business |
| Kelsey-Hayes Company | Milford Optimization Study |
| Lear Corporation | A&D Scoping Session: Improving OEE in Injection Molding |
| Lord Corporation | Dayton Plant Expansion |
| Lucas Aftermarket Manufacturing (TRW Automotive) | Production Introduction - New Vehicle Accessory Product |
| Lucas Aftermarket Manufacturing (TRW Automotive) | Phase II: VSS Product Introduction |
| Maremont Exhaust System Prods. | Material Handling System for High Volume Exhaust Pipes |
| Maremont Exhaust System Prods. | Establishing the Feasibility of a Massive Pipe Cost Reduction Program |
| Maremont Exhaust System Prods. | Achieving Massive Cost Reduction in Pipe Manufacturing |
| Maremont Exhaust System Prods. | Programming Work - Additions to the P.P.O. System |
| MCL/Bowen | Design of an Electric Vehicle Reversing Switch |
| McQuay-Norris Inc. (Brake Parts, Inc.) | Investigation of Hook Joint Manufacture |
| Meritor Auto. Inc. (ArvinMeritor) | Project Management Training |
| Meritor Auto. Inc. (ArvinMeritor) | Project Management Training in Italy |
| Meritor Auto. Inc. (ArvinMeritor) | Project Management Meeting |
| Meritor Auto. Inc., Off-Hwy. Prod. & Sys. (ArvinMeritor) | New Assembly Plant |
| Meritor Auto. Inc., Off-Hwy. Prod. & Sys. (ArvinMeritor) | Assembly Plant Assistance |
| Meritor Auto. Inc., Off-Hwy. Prod. & Sys. (ArvinMeritor) | Facilities/Product Rationalization and Consolidation |
| Meritor Auto. Inc., Off-Hwy. Prod. & Sys. (ArvinMeritor) | Facilities/Product Rationalization and Consolidation |
| Meritor Auto. Inc., Off-Hwy. Prod. & Sys. (ArvinMeritor) | Facilities/Product Rationalization and Consolidation |
| Meritor Automotive (ArvinMeritor) | Project Management Training |
| Metalsa, Proeza Automotriz | Develop Mathematical Model |
| Metalsa, S.A. de C.V. | Phase III: Facility Planning and Improvements - Manufacturing Cell Implementation Assistance |
| Metalsa, S.A. de C.V. | Facility Expansion Planning for Manufacture of Automobile and Truck Frames |
| Metalsa, S.A. de C.V. | Tool and Die Shop Facility Improvement and Modernization Planning |
| Metalsa, S.A. de C.V. | Initial MRP Evaluation |
| Metalsa, S.A. de C.V. | Detailed Planning and Implementation Assistance - Production and Tooling Groups |
| Metalsa, S.A. de C.V. | Conceptual and Basic Engineering Plan for Metalsa ‘95 |
| Metalsa, S.A. de C.V. | Phase II: Facility Planning and Improvements |
| Metalsa, S.A. de C.V. | Facility Layout |
| Metalsa, S.A. de C.V. | Consolidation of Metalsa and Perfek Facilities |
| Moog Automotive (Federal-Mogul) | Survey of Moog Satellite Facilities |
| Moog Automotive (Federal-Mogul) | Critique Factory Plans for Mayville Plant |
| Moog Automotive (Federal-Mogul) | Strategic Overview of Firm’s Markets and Resources |
| Mo-Re-Sa | Expansion Planning and Facilities Improvements - Piston Machining |
| Mo-Re-Sa | Implementation Planning for Piston Facility Expansion |
| Motor Panels | Die Shop Manufacturing Strategy |
| Nemak S.A. (ALFA) | Capacity Analysis For (Ford) Windsor Foundry |
| Nemak S.A. (ALFA) | Critique of New Foundry |
| Owatonna Tool (SPX/OTC Service Solutions) | Future Factory Paint System |
| Pirelli Ltd. | Assistance With JIT Manufacture at Tyres |
| Rearsby Automotive Ltd. (Adwest Rearsby Ltd.) | Assistance with Manufacturing Layout and Organization |
| Renold Plc | Civil, Mechanical and Electrical Design Work - Business Consolidation |
| Renold Plc | Preparation of Manufacturing and Facilities Plans - Phase II: Detailed Engineering |
| Renold Plc | Consolidation of Fluid Power and Helical Gear Business at Bradford |
| Renold Plc | Division of West Works and Associated Demolitions |
| Renold Plc | Design and Site Management of Case Machining Foundation |
| Repco Manufacturing Group (Repco Ltd.) | Assistance in Planning a Financially Justified Manufacturing Plan for the Repco Clutch Co. |
| Rockford Powertrain Inc. | Preparation for Manufacturing Modernization |
| Rockford Powertrain Inc. | Detail Analysis and Developing the Change Plan |
| Rubery-Owen Holdings | |
| S & S Engineering Ltd. | Develop Production Order Procedures for Stores, Production Control and Purchasing |
| S&S/Superior of Ohio Inc. | Critical Analysis of Operations |
| Secim-Clesid | Management Control System for the Transmission Department |
| Secim-Clesid | Long-Term Plan for Gear Department |
| Secim-Clesid | Audit of the Transmission Department |
| Stanadyne Corporation | Facilities Analysis and Layout for Moen Division Plant in New Bern, NC |
| Stankiewicz | One-Day Critical Analysis |
| T.I. Silencers | Investigation of Manufacturing System for Exhaust Systems |
| T.R.W. Cam Gears Ltd. (TRW Automotive) | FMS Overview for the Manufacture of Pinion Housings |
| Tenneco Turkiye Inc. | Assessment of Feasibility of Manufacture of Mechanical Parts and Assemblies in Turkey |
| Torrington Company, The (Acquired by Timken) | Critique Automation Plan |
| Torrington Company, The (Acquired by Timken) | Analysis of Tyger River Plant in Union, SC |
| Torrington Company, The (Acquired by Timken) | Development of a Mission Statement for Factory Overhaul |
| Valley Drive Systems Inc. | Layout and Systems Analysis |
| Warner Electric Brake & Clutch (BorgWarner) | Planning & Assembly Implementation Management - New Automotive Air-Conditioning Clutch for Ford |
| Warner Electric Brake & Clutch (BorgWarner) | Automation Planning for Fractional Horsepower Clutch Production |
| Warner Electric Brake & Clutch (BorgWarner) | Engineering Concept Review |
| Warner Electric Brake & Clutch (BorgWarner) | Critique Plan for New Clutch |
| Warner Electric Brake & Clutch (BorgWarner) | Productivity and Manufacturing Cost Improvement |
| Warner Gear (BorgWarner) | Facilities Expansion and Improvements Study for Shafts and Gears |
| WheelTek (Division of Amcast Industrial Corp.) | Understand Present Machining Operations to Write Proposal for Assistance |
| Widney Products Ltd. | Study: Design of a Range of Telescopic Drawer Slides |