| Commercial & Specialty Vehicles |
| Company | Project Description |
| Ashok Leyland Ltd. | Facilities and Productivity Improvement |
| Ashok Leyland Ltd. | Facilities Expansion Planning |
| Balkancarimpex (Balkancar) | Modernization of Forging Facilities |
| Balkancarimpex (Balkancar) | Phase II: Production Program for Stamped Torque Convertor Parts |
| Balkancarimpex (Balkancar) | Phase III: Production Program for Stamped Torque Convertor Parts |
| Balkancarimpex (Balkancar) | Pre-Investment Study of Manufacturing Systems |
| Balkancarimpex (Balkancar) | Production for Stamped Torque Convertor Parts |
| Balkancarimpex (Balkancar) | Review Investment Plan for Varne Diesel Engine Plant - (SR in German) |
| Butterfield Harvey PLC | Industrial Relations |
| Detroit Diesel Allison (Detroit Diesel Corp.) | APT Videotape Training Course |
| Detroit Diesel Allison (Detroit Diesel Corp.) | APT Videotape Training Course |
| E-Z-GO | Customer Satisfaction Brainstorming |
| E-Z-GO | Manufacturing and Assembly Reconfiguration |
| E-Z-GO | Project Review |
| E-Z-GO | Review of Facility Improvement Assistance Needs |
| E-Z-GO / Textron | Project Review |
| Jerr-Dan Corporation | Proposal Preparation |
| Klockner-Humboldt-Deutz AG (Iveco) | Computer Simulation (Final Report in German) |
| Klockner-Humboldt-Deutz AG (Iveco) | Cylinder Head Manufacturing System Evaluation |
| Klockner-Humboldt-Deutz AG (Iveco) | Detail Planning and Implementation Assistance for New Automotive Engine Plant |
| Klockner-Humboldt-Deutz AG (Iveco) | Detail Planning and Implementation Assistance for New Plant for Automotive Engines |
| Klockner-Humboldt-Deutz AG (Iveco) | Development of an Economical and Flexible Transfer Line Concept for New Facility (FMS) |
| Klockner-Humboldt-Deutz AG (Iveco) | Feasibility Study for New Engine Plant |
| Klockner-Humboldt-Deutz AG (Iveco) | Flexible Manufacturing System Planning for Diesel Engine Crankcase Production |
| Klockner-Humboldt-Deutz AG (Iveco) | Production Improvement of the 5- and 6-Cylinder FL 912 Crankcase Line |
| Klockner-Humboldt-Deutz AG (Iveco) | Productivity Improvement Project for Diesel Engine Manufacturing Plant (SR in German only) |
| Klockner-Humboldt-Deutz AG (Iveco) | Simulation of Engine Assembly Plant |
| Klockner-Humboldt-Deutz Inc. (Iveco) | Manufacturing and Raw Material Selection for D-8 Diesel Engine Components |
| Lacre Ltd. | BTAS/Q B55750 Part 2: Advisory Project |
| Lacre Ltd. | CAD Critique |
| Mack Trucks, Inc. | Addressing Problems During Cell Implementation |
| Mack Trucks, Inc. | Implementation Assistance |
| Mack Trucks, Inc. | Plant Consolidation/Improvement Program |
| Mack Trucks, Inc. | Thinking About Cells |
| Meritor Auto. Inc., Heavy Vehicle Sys. (ArvinMeritor) | Global Operations Cost Reduction Effort |
| Meritor Auto. Inc., Heavy Vehicle Sys. (ArvinMeritor) | Global Operations Cost Reduction Effort |
| Meritor Auto. Inc., Heavy Vehicle Sys. (ArvinMeritor) | Preparation of a Training Manual |
| Paccar Inc. | Cellularization of Assembly and Stores Building |
| Paccar Inc. | CIM Seminar for PACCAR’s Top Executives |
| Paccar Inc. | Review Planning Methodology for a Centralized Manufacturing Facility |
| Trailor | Critical Analysis of Order Processing |
| Trailor | Industrial Development Master Plan for Road Trailer Manufacturing |
| White Motor Corp. | Manufacturing Systems for New Design Diesel Cylinder Heads and Blocks |