| Construction Products & Equipment |
| Company | Project Description |
| Acro Construction | Relocation of Trafalgar Operation |
| Aqua Flow Regulators Ltd. | Study: Development of Non-Return Valve |
| Argosy Fence Supplies Ltd. | Modernization of Fence Manufacturing Facility |
| Armor Elevator Company Inc. (Acquired by Kone) | Facilities Improvement Study for Machining of Elevator Components & Assembly of Geared Machines |
| Armor Elevator Company Inc. (Acquired by Kone) | Manage Manufacturing/Procure Parts for Five Prototype Elevator Machines |
| Armor Elevator Company Inc. (Acquired by Kone) | Design Concept and Detail Engineering - Fabricated Traction Elevator Machines |
| Astec Industries, Inc. | Placement of Large Whitney Machine |
| Benford Concrete Machinery (Acquired by Terex) | Feasibility Study for Computer-Aided Production Management |
| Blaw-Knox Construction Equip. Corp. (Acquired by Ingersoll-Rand) | Design for Manufacturing—Paver Main Frame |
| Blaw-Knox Construction Equip. Corp. (Acquired by Ingersoll-Rand) | Flow Analysis and Simulation |
| Blaw-Knox Construction Equip. Corp. (Acquired by Ingersoll-Rand) | Development of a Welding Fixture |
| Blaw-Knox Construction Equip. Corp. (Acquired by Ingersoll-Rand) | Conceptual Development of Welding Fixture |
| Blaw-Knox Construction Equip. Corp. (Acquired by Ingersoll-Rand) | Facilitization |
| Boral Acrow Pty. Ltd. | Developing a Rationalization and Manufacturing Plan |
| Boral Johns Perry Ltd. (Acquired by Advanced Building Technologies Ltd.) | Planning and Implementing a Revised Site and Factory Plan |
| Boral Windows (Boral Window Systems Ltd.) | Productivity Improvement Study at Extrusion Plant |
| British Reinforced Concrete Eng. (BRC) | Electrical Specification and Design Guidelines for Control Systems of Mesh Welding Machines |
| British Reinforced Concrete Eng. (BRC) | Evaluation of Quality Function to Comply with BS5750 - Part 2 |
| Bucyrus-Erie Company (Bucyrus International) | Tooling Evaluation for Horizontal Bar Machines |
| Bucyrus-Erie Company (Bucyrus International) | Concept Development for Field Machining of Roller Rail Pads After Assembly |
| Caradon Curran Ltd. (Carradon Plumping Solutions) | Mechanical Handling for New Steel Bath Facility |
| Caradon Curran Ltd. (Carradon Plumping Solutions) | Review of Manufacturing Operations at Cardiff |
| Caradon Curran Ltd. (Carradon Plumping Solutions) | Implementation of New Steel Bath Manufacturing Procedure |
| Caradon Twyfords Ltd. (Carradon Plumping Solutions) | Site Survey at Cardiff |
| Caterpillar Belgium S.A. | Materials Control and Purchasing |
| Caterpillar Belgium S.A. | Assistance with Material Handling Scheme |
| Caterpillar Belgium S.A. | Production Engineering and Methods |
| Caterpillar Belgium S.A. | Simulation of Building and Sequence |
| Caterpillar Belgium S.A. | Implementation Planning |
| Caterpillar Belgium S.A. | New Systems Concept |
| Caterpillar Belgium S.A. | Systems Planning |
| Caterpillar Belgium S.A. | Systems Assistance |
| Caterpillar Brazil S.A. | Modernization Planning |
| Caterpillar Brazil S.A. | Modernization Planning - Santo Amaro and Piracicaba |
| Caterpillar Brazil S.A. | Modernization Planning |
| Caterpillar France S.A. | Core Buy Review - Provisioning Planning “Should Cost” Exercise |
| Caterpillar France S.A. | Strategic Plan |
| Caterpillar Fuel Systems | Benchmarking Operations (Internal) |
| Caterpillar Fuel Systems | Expanding the Supplier Network |
| Caterpillar Inc. | Help Increase Capacity of Valve Production |
| Caterpillar Inc. | Inventory Analysis |
| Caterpillar Inc. | Logistics Analysis |
| Caterpillar Inc. | Logistics Seminar Design and Preparation |
| Caterpillar Inc. | Logistics Seminar |
| Caterpillar Inc. | Manufacturing System for the HEUI-C Fuel Injector |
| Caterpillar Inc. | Analyzing Material Handling Equipment Strategy and Needs |
| Caterpillar Inc. | Materials Management and Purchasing Methods - Step 1: Analyze Available Information |
| Caterpillar Inc. | Plant Modernization Review (See 63342 For All Other Data) |
| Caterpillar Inc. | Finalize PWAF Plan |
| Caterpillar Inc. | Track Link Sequencer Planning |
| Caterpillar Inc. | Analysis of Plate Handling Logistics |
| Caterpillar Inc. | Analysis of Thomasville Facility |
| Caterpillar Inc. | Analyze Solenoid Flux Field Decay |
| Caterpillar Inc. | H1300 Parts Production Strategy |
| Caterpillar Inc. | H1300 Parts Production Strategy |
| Caterpillar Inc. | Simulate Heat Treat Operations |
| Caterpillar Inc. | Simulate New Alternatives For Heat Treat Areas |
| Caterpillar Inc. | Systems Architecture |
| Caterpillar Inc. | Audit PWAF Plan and Sequencer Design |
| Caterpillar Inc. | Audit Sequencer Implementation |
| Caterpillar Inc. | Conduct an Audit of Conditionsfor Track Assembly Sequencer |
| Caterpillar Inc. | Analyze and Evaluate Manufacturing Services |
| Caterpillar Inc. | Configuring Project Sierra |
| Caterpillar Inc. | Define Magnitude of Tasks/Challenges to Implement the Defined Benefits of Truck Module |
| Caterpillar Inc. | Linking the Mossville PWAF With the Strategic Business Plan |
| Caterpillar Inc. | PWAF Planning |
| Caterpillar Inc. | Plant Requirements for PWAF Systems Implementations |
| Caterpillar Inc. | Assistance With PWAF Planning |
| Caterpillar Inc. | Plant With A Future (Bundles) |
| Caterpillar Inc. | PWAF Planning - Rubber Processing Bundle and Mobil Trac System Bundle |
| Caterpillar Inc. | Management of People Through Change |
| Caterpillar Inc. | Implementation of Sequencers |
| Caterpillar Inc. | Implementation of Track Sequencer |
| Caterpillar Inc. | Solving Yield Problem For H150 Injector |
| Caterpillar Inc. | Reorganize Hydraulic Injector Machine Shop |
| Caterpillar Inc. | Solving Yield Problem For H150 Injector |
| Caterpillar Inc. | Plan For Improving Rebuild Operation At Thomasville |
| Caterpillar Inc. | Cost Analysis of Auto and Light Truck Injector |
| Caterpillar Inc. | Improving Productivity of the Clutch Disc Facility |
| Caterpillar Mitsubishi Ltd. | Develop Macro Layout for “Vision 90” Giving Optimum Work Flow, Lead Time and Density |
| Caterpillar S.A. de C.V. | Strategic Manufacturing Plan |
| Caterpillar S.A. de C.V. | Modify Mathematical Model |
| Clark Equipment Company (Ingersoll-Rand) | Test Feasibility of Assembling Tractor Shovels On a Paced Assembly Line |
| Clark Equipment Company (Ingersoll-Rand) | Feasibility Study - Fabrication/Weld Area |
| Clark Equipment Company (Ingersoll-Rand) | Design a Paced Fabrication System for Articulated Frame Tractor Shovels |
| Clark Equipment Company (Ingersoll-Rand) | Facilities Improvement Study for Finish Machining of Rear Axle Housings |
| Clark Equipment Company (Ingersoll-Rand) | Phase I: Evaluation and Conceptual Planning Lima, OH, Facility |
| Clark Equipment Company (Ingersoll-Rand) | Evaluation of Flame Cutting Operations |
| Clark Equipment Company (Ingersoll-Rand) | Balanced Line Production System Assembly |
| Clark Equipment Company (Ingersoll-Rand) | Develop Preliminary Facility Master Plan |
| Clark Equipment Company (Ingersoll-Rand) | Develop Plan for Consolidating Lift Truck Manufacturing at Georgetown Plant |
| Cotexsa | Logistic Plan for Building Products Distribution |
| Crittall Windows Ltd. | Evaluation of Robot Application for Welding Railway Level Crossing Fabrications |
| Cutting Edges P/L | Development Strategy |
| Deere & Company | Engineering Assistance - Venezuelan Tractor Project |
| Deere & Company | Facilities Planning and Prod. Improvement—Cylinder Block and Head Lines for Saran, France, Plant |
| Deere & Company | Simulation |
| Deere & Company | Gateway Operations Plan |
| Deere & Company | Facility Rationalization Plan |
| Delta Faucet | Operational Improvement: Increase Throughput |
| Dorf Industries Pty Ltd. (Dorf Clark Industries) | Assistance With Planning a Site Layout Based on Best Manufacturing Practice |
| Dorf Industries Pty Ltd. (Dorf Clark Industries) | Reorganization and Resiting of Facilities |
| Dorf Industries Pty Ltd. (Dorf Clark Industries) | Reorganization and Resiting of Facilities |
| Duratex S.A. | Manufacturing Facility Expansion Planning - Plumbing Fixtures |
| Duratex S.A. | Manufacturing Master Plan for the Duratex Ceramics Factories |
| Duratex S.A. | Implementation of Polishing and Buffing Improvements |
| Duratex S.A. | Witness Testing of Automatic Buff and Polish Equipment and Reviewed Plating Process |
| Duratex S.A. | Subcontract Work - Smith Associates |
| E.A. Higginson & Co. Ltd. | Advice on Machine Selection and Layout |
| E.N.A.S.A. | System Study for Advanced Manufacturing System for Cylinder Heads |
| Elkay Manufacturing Co. | Analysis of Engineering Support Function |
| Elkhart Products Corporation | Analysis of Improvement Opportunities |
| Elkhart Products Corporation | Extrusions and Castings for the Auto Industry (flow control products) |
| Elkhart Products Corporation | Re-Planning Arkansas Tubing Facility |
| Elkhart Products Corporation | Improvements to Extrusion Process |
| Emco Ltd. | Critical Business Analysis |
| Escol Panels Ltd. | Quality Assurance BS5750 - Part 2 |
| Etnyre & Company | Evaluate Cells in Fab Shop |
| Etnyre & Company | Feasibility Project |
| Etnyre & Company | Develop Consolidation Plan for Operations at Sites of Buildings B, C and D |
| Etnyre & Company | Technical Assistance |
| Fiat-Allis Construction Machinery | Facilities Plan for Fabrication, Machining, Assembly and Testing of Crawler Tractors |
| Forticrete Ltd. | Feasibility Study of Application of a Robot |
| Grasis Corp. | Facility Planning - Self-Supporting and Guyed Towers |
| Halsey-Taylor | Rough-Cut Evaluation of Process and Equipment Requirements |
| Halsey-Taylor (Elkay) | Preparation and Testimony for EPA Hearing on Paint System |
| Harris Walton Ltd. (Harris Walton Lifting Gear) | Study: Improved Machine Utilization and Reduced Maintenance Losses |
| Herbert Morris | Financial Analysis of Client’s Manufacturing Plan |
| Hilti AG | Development of a New Manufacturing Strategy |
| Hilti AG | Development of Project Plan for Manufacturing Strategy Study |
| Industrias Villares S.A. | Manufacturing Facility Expansion Plan |
| Ingersoll-Rand Company | Implement Assembly Cell |
| Ingersoll-Rand Company | Implementation of Assembly Cell |
| Ingersoll-Rand Company | Planning Assembly Operations |
| Ingersoll-Rand Company | CIM Seminar |
| Ingersoll-Rand Company | Assistance With Capital Expenditure Request Presentation |
| Ingersoll-Rand Company | Pilot Cell Development - Closed Impeller Manufacturing |
| Ingersoll-Rand Company | Master Plan for Manufacturing Cost Reduction and Consolidation |
| Ingersoll-Rand Company | Improvement Study - Operation and Utilization of Ingersoll Traveling Housing Boring Machine |
| Ingersoll-Rand Company | Audit Turning Equipment Operations for the Algerian Compressor Plant |
| Ingersoll-Rand Company | Master Manufacturing Plan to Support Business Plan |
| Ingersoll-Rand Company | Planning and Selecting Manufacturing System for Producing Large Machinery |
| Ingersoll-Rand Company | System Support for the Consolidated Facility |
| Ingersoll-Rand Company | Concept Improvements for Receiving Area and Material Handling |
| Ingersoll-Rand Company | Implementation Assistance for Overhead Reduction |
| Ingersoll-Rand Company | Overview Consolidation Plan |
| Ingersoll-Rand Company | Non-Disclosure Agreement: Process Review for 85mm Aluminum Gear and Rotor Housing |
| Ingersoll-Rand Company | Assist Assembly and Cell Manufacturing Task Forces in Identifying Cost Reduction Opportunities |
| Ingersoll-Rand Company | Productivity Improvement Study for Connecting Rod Line |
| Ingersoll-Rand Company | Simultaneous Engineering and Manufacturability Analysis and Operations Plan |
| Ingersoll-Rand Company | Non-Disclosure Agreement: Manufacturability Review of 30-Ton Compressor |
| Ingersoll-Rand Company | New Compressor Feasibility Study |
| Ingersoll-Rand Company | Critical Analysis |
| Ingersoll-Rand Company | Critique Past Project |
| Ingersoll-Rand Company | Phase I: Critique Conceptual Plan |
| Ingersoll-Rand Company | Critique Master Plan Implementation Work |
| Ingersoll-Rand Company | Critique Ingersoll-Rand Plan |
| Ingersoll-Rand Company | Critique Ingersoll-Rand Plan |
| Ingersoll-Rand Company | Critique Implementation Team |
| Ingersoll-Rand Company | Post-Project Audit at I-R Facilities Where IE has Done Planning |
| Ingersoll-Rand Company | Ingersoll-Rand Audit |
| Ingersoll-Rand Company | Identify Cost Reduction Opportunities at the Nashua Plant |
| Ingersoll-Rand Company | Develop a Master Business Plan for Cost Reduction |
| Ingersoll-Rand Company | Facilities Planning for Advanced Manufacturing System for Air Compressor Cylinders |
| Ingersoll-Rand Company | Facilities Planning for Centrifugal Air and Gas Compressors |
| Ingersoll-Rand Company | JDL Compressor Implementation Revision and Update - New Plant Layout |
| Ingersoll-Rand Company | Phase II: Facilities Master Plan for Allentown Operation |
| Ingersoll-Rand Company | Assessment of Current Facilities Plan |
| Ingersoll-Rand Company | Assistance in Factory Planning |
| Ingersoll-Rand Company | Implementation Master Plan |
| Ingersoll-Rand Company | Master Plan |
| Ingersoll-Rand Company | Master Plan |
| Ingersoll-Rand Company | Master Planning |
| Ingersoll-Rand Company | Connecting Rods Manufacturing |
| Ingersoll-Rand Company | First Step of Implementation - JDL Compressor Project |
| Ingersoll-Rand Company | Implementation of JDL Compressor Project |
| Ingersoll-Rand Company | Increasing Shipments by Two to Three Times |
| Ingersoll-Rand Company | Implementation - “War Room” |
| Ingersoll-Rand Company | Implementation |
| Ingersoll-Rand Company | Implementation |
| Ingersoll-Rand Company | Implementation for Pump Facility |
| Ingersoll-Rand Company | Phase II: Detailed System Definition |
| Ingersoll-Rand Company | Presentation of Master Plan to Ingersoll-Rand Senior Management in Woodcliff Lake |
| James Gibbons Format Ltd. | Evaluation of an Automated Manufacturing Cell for Latch and Pull Handle Production |
| JLG Industries Incorporated | Design For Manufacture |
| JLG Industries Incorporated | Critical Analysis of Scissors Lift Assembly |
| JLG Industries Incorporated | Should Cost Analysis For In-House Sourcing Fabrication |
| JLG Industries Incorporated | Sanity Checks |
| JLG Industries Incorporated | Review Alternative Building Arrangements |
| JLG Industries Incorporated | Improving Production and Developing New Plant Layout |
| Kone, Belgium | Productivity Improvement for Automatic Elevators |
| LCN Closers | Analysis of Paint, Assembly, and Shipping Logistics |
| LCN Closers | Plan to Implement Capital Expenditure Request |
| LCN Closers | Optimal Factory Assistance |
| LCN Closers | Optimal Factory Assistance |
| LCN Closers | Optimal Factory Assistance |
| Lone Star Industries | Strategic Study: New Orleans Facility |
| Manitowoc Engineering Company (The Manitowoc Company) | Value Analysis and Value Engineering for the M250 Crane |
| Marlow and Co. Ltd. | Methods Improvement |
| Matbro Bray Ltd. | Recommendations for On-Line Assembly of Vehicles |
| Montaz Mautino (Gimar Montaz Mautino) | Critical Analysis |
| Morgan Engineering | Productivity Improvements and Cost Reduction Machine Shops |
| NEI Cranes Ltd. (Clarke Chapman Group) | Machine Shop Improvements |
| Newman Tonks Engineering Ltd. (Acquired by Ingersoll-Rand) | Redesign for Economical Production of the Briton 5000 Door Closer |
| Outdoor Technologies Inc. | Product Evaluation and Critique |
| Owens-Corning Fiberglas | Strategy Development for CAD/CAM Applications |
| Owens-Corning Fiberglas | Two-Day Consultation - CAD/CAM |
| Ravaglioli SpA | Industrial Action Plan |
| Ravaglioli SpA | Industrial Action Plan |
| Ravaglioli SpA | Industrial Action Plan Follow-Up |
| Ravaglioli SpA | Industrial Action Plan Follow-Up |
| Ravaglioli SpA | Industrial Action Plan Follow-Up for Garage Equipment Manufacture |
| Sears Manufacturing Company (Sears Seating) | Facilitate and Train in the Development of a Master Plan |
| T.I. Bradbury Ltd. | Design for the Ease of Manufacture of a Two Post Car Lift |
| T.I. Transport Equipment Ltd. | Redesign and Value Engineering Exercise on a Two Post Vehicle Lift to Reduce Mfg. Costs |
| Thermalite Ltd. | Assistance in Specifying Shrink Wrap Facilities for Building Blocks |
| Thermalite Ltd. | Investigate the Use of Ground Sand at Metford |
| Thermalite Ltd. | Specification, Acquisition & Project Management of Construction, Installation & Comm. of New Machine |
| Thermalite Ltd. | Implementation of Cake Cutting Changes |
| Trepel GmbH | Implementation of New Order Processing and Production Organization |
| Vulcan Materials | Analysis & Implementation Design - Site Rationalization |
| Vulcan Materials | Phase I: Transactional Lean and Six Sigma Implementation |
| Vulcan Materials | Phase II: Transactional Lean & Six Sigma Implementation |
| Vulcan Materials | Transactional Lean & Six Sigma Implementation |
| Ward Building Components (Ward Insulated Panels Ltd.) | Development of a Financially Justified AMT/Business Strategy |
| Warner & Swasey | CAD/CAM Presentation and Discussion |
| Winget | Machine Shop Reorganization |
| Worthington Compressors, Inc. | Four-Step Facilities Planning Project |
| Worthington Compressors, Inc. | Feasibility Manufacturing Plan for the Air Power Equipment Products |