| Electrical & Electronic Equip. & Supplies |
| Company | Project Description |
| A.O. Smith Corp. | Implementation of Automated Systems |
| A.O. Smith Corp. | Developing Logistics Requirements for GMT400 Frame and Crossbar Assemblies |
| A.O. Smith Corp. | Phase I: Develop Manufacturing Strategy for Electric Motor Business |
| A.O. Smith Corp. | Modernizing Shaft Manufacturing Facilities |
| A.O. Smith Corp. | Tooling and Inspection Review |
| Allen-Bradley GmbH (Rockwell Automation) | Product/Market Assessment for Control Equipment Plcs |
| Alpha Precision | Technical Review of New Product |
| American Fluorescent | Facility Improvements / Business Assessment |
| Amphenol Corporation | Process Development and Training For Steel High-Temp Molding Area |
| Amphenol Corporation | Concurrent Engineering Training |
| Amphenol Corporation | Concurrent Engineering Training |
| Amphenol Corporation | Concurrent Engineering Training |
| Amphenol Ltd. | Phase I: Pre-Feasibility Automated Assembly Study |
| Ansaldo Componenti SpA (Finmeccania) | CIM Master Plan |
| Ansaldo Componenti SpA (Finmeccania) | Measure of Results Versus Objectives In The Context of CIM Implementation |
| Ansaldo Componenti SpA (Finmeccania) | Critical Analysis and Industrial Plan |
| Ansaldo Componenti SpA (Finmeccania) | First Thoughts on Support Activity |
| Ansaldo Componenti SpA (Finmeccania) | Functional Analysis - Monfalcone Plant |
| Ansaldo Componenti SpA (Finmeccania) | Project Control Assistance |
| Ansaldo Componenti SpA (Finmeccania) | Assistance with a Hungarian Company Evaluation in View of Purchasing: Electric Motors |
| Appleton Electric Company | Distributor Survey for New Product |
| Arnold Engineering Company | Phase I: Modernization Plan for MPP Production |
| Arnold Engineering Company | Upgrade of the MPP Production Facility (Cells) |
| Automatic Switch Co. (ASCO / Emerson) | Material Control Systems Analysis |
| Automatic Switch Co. (ASCO / Emerson) | Planning for Consolidation (Extension of 67134) |
| Automatic Switch Co. (ASCO / Emerson) | Planning Assistance for Die-Cast Process |
| Automatic Switch Co. (ASCO / Emerson) | Phase II: Technology Upgrade |
| Automatic Switch Co. (ASCO / Emerson) | Facilities/Products Rationalization (Involved Five Locations) |
| Automatic Switch Co. (ASCO / Emerson) | Phase I: Valve Manufacturing Technology Assessment at Florham Park, NJ, and Aiken, SC |
| Automatic Switch Co. (ASCO / Emerson) | Continuation of Phase II: Technology Upgrade |
| Automatic Switch Co. (ASCO / Emerson) | Implementation |
| Automatic Switch Co. (ASCO / Emerson) | Continuation of Valve Split Project |
| Automatic Switch Co. (ASCO / Emerson) | Detail Engineering for Valve Families |
| Automatic Switch Co. (ASCO / Emerson) | Detail Planning |
| AXA Conductores Monterrey S.A. | Overview of Operations |
| Beloit Corp. (Regal Beloit) | Production Improvement - Openside Horizontal Boring Machines |
| Beloit Corp. (Regal Beloit) | Facilities Improvement Project |
| Beloit Corp. (Regal Beloit) | Facilities Improvement Study for Cylinder Work Machine Shops |
| Beloit Corp. (Regal Beloit) | Long-Term Resource Planning |
| Best Power Technology Inc. (Invensys) | Assistance in Resolving Production Cost and Quality Problems |
| Betts Electric Motors (Brook Crompton-Betts) | Assistance with Introduction of Total Quality Management |
| BICC Cables Ltd. | JIT Workshop |
| BICC Pyrotenax Ltd. (Tyco) | Short-Term Improvement Plan Incorporating JIT for “Whites” Facility At Hebburn |
| BICC Pyrotenax Ltd. (Tyco) | Development of an Information System Strategy for The Thermoheat Business |
| Boldt Metronics International | Plant Relocation |
| Boldt Metronics International | Plant Relocation |
| Bonar Bray Ltd. | Redesign of an Electromechanical Contractor |
| Bonar Long Ltd. | Production Management System Audit |
| Combustion Engineering (ABB) | NC Programming System Review |
| Combustion Engineering (ABB) | Manufacturing Engrg. Audit - Equipment Accuracy and Suitability/Overview Tolerance Requirements |
| Combustion Engineering (ABB) | Machine Operation and Utilization Study of Nuclear Component Machines |
| Combustion Engineering (ABB) | Machine Utilization Improvement Program - Implementation |
| Combustion Engineering (ABB) | New Super Mill Product Analysis |
| Combustion Engineering (ABB) | Audit Continuation and Expansion of Bay 5 Pilot Program |
| Combustion Engineering (ABB) | Identifying New Market Opportunities for Forged Products - Beaumont Well Works |
| Combustion Engineering (ABB) | Improve Quality and Delivery - Analyze Manufacturing System and Suggest Improvements |
| Communication & Control Engr. | Handling System for De Angeli |
| Communication & Control Engr. | Development of Short-Term Improvements for Cable Division |
| Compagnie Electro-Mecanique (ABB) | Electric and Assembly Shop Survey |
| Compagnie Electro-Mecanique (ABB) | Fabrication and Machine Shop Project |
| Compagnie Electro-Mecanique (ABB) | Detail Study of Heavy Shop |
| Compagnie Electro-Mecanique (ABB) | Alternator Shop Survey |
| Compagnie Electro-Mecanique (ABB) | Small and Medium Shops Problem Definition |
| Compagnie Electro-Mecanique (ABB) | Concept Planning - New Turbine and Alternator Manufacturing Facility |
| Compagnie Electro-Mecanique (ABB) | Define Conceptual Form of Main Characteristics of New Blade Shop |
| Compagnie Electro-Mecanique (ABB) | Revise Heavy Shop Facilities Planning to Adapt to New Market Forecast |
| Compagnie Electro-Mecanique (ABB) | Develop Project Master Plan |
| Compagnie Electro-Mecanique (ABB) | Project Management Assistance - New Blade Shop Implementation |
| Compagnie Electro-Mecanique (ABB) | Long-Term Plan for Manufacture of Large Transformers |
| CSEE | Industrial Development Plan |
| CSEE | Industrial Development Plan |
| CSEE | Industrial Development Plan |
| CSEE | Industrial Development Plan |
| CSEE | Industrial Development Plan for Electronic Product Manufacture |
| CSEE | Industrial Development Plan for Electronic Products |
| CSEE | Industrial Development Plan for Manufacture of Electronic Products |
| CSEE | Industrial Development Plan for Electronic Products |
| CSEE Transport (Ansaldo Signal) | Phase II: New Plant Implementation: Railway Equipment |
| Danfoss A/S | Manufacturing Strategy |
| Doduco GmbH & Co. (AMI Doduco) | Concept for Distribution Logistics Planning |
| Doduco GmbH & Co. (AMI Doduco) | Concept for Production Planning and Control of Contact Material Plant |
| Doduco GmbH & Co. (AMI Doduco) | Concept for Overall Production Planning and Control System (Contacts) |
| Doduco GmbH & Co. (AMI Doduco) | European Strategy |
| Doduco KG, Dr. E. Durrwachter (AMI Doduco) | Critical Analysis of Precious Metals Division |
| Doduco KG, Dr. E. Durrwachter (AMI Doduco) | Step 2: Implementation of New Concept for Precious Metal Division |
| Doduco KG, Dr. E. Durrwachter (AMI Doduco) | Step 2: Implementation of New Concept for Precious Metal Division |
| Doduco KG, Dr. E. Durrwachter (AMI Doduco) | Implementation of New Concept for Precious Metal Division |
| EDL Industries Ltd. | Evaluation of Quality Function to Comply with BS5750 - Part 2 |
| Egatube Ltd. | Feasibility Study for Introduction of Computer-Based Engineering System |
| Elektro-Mechanik GmbH (EMG) | Rough Concept for Order Processing Procedures for Adjustable Electrical Torque Drives |
| Elmwood Sensors Ltd. | Preparation and Implementation of a Manufacturing Strategy Incorporating JIT |
| Emerson Electric Company | Cell Planning |
| Emerson Electric Company | Plant Layout of Green Field Site |
| Emerson Electric Company | Identify Opportunities to Improve Information Flow |
| Emerson Electric Company | Consolidation Study |
| Emerson Electric Company | Facility Consolidation Study |
| Emerson Electric Company | Education and Team Building for Productivity Improvement |
| Emerson Electric Company | Review Status of EMD/Copeland Scroll Program |
| Emerson Electric Company | Detail Planning |
| Emerson Electric Company | Phase II: Consolidation Plan |
| Emerson Electric Company | Team Building and Problem-Solving Training |
| Emerson Electric Company | Presentation Development |
| English Electric Co. Ltd. | System Study to Develop Advanced Manufacturing System for Steam Turbine Blades |
| English Electric Co. Ltd. | Industrial Steam Turbine Manufacturing Study |
| ESCO Corporation (Rantec Power Systems) | Consolidation of Facilities - Physical Plant and Personnel to Achieve Operating Cost Reduction |
| Essex Group, Inc. | Assistance With Proposal Preparation for New Plant to Produce Injectors and Pumps |
| Fairey Holdings Ltd. (Spectris) | Assistance in License Purchasing for Military Vehicles |
| GEC High Voltage Switchgear Ltd. | Plant Reorganization |
| GEC Industrial Controls Ltd. | Redesign of the Manufacturing Business |
| GEC Industrial Controls Ltd. | Strategic Workshop |
| GEC Traffic Automation | Evaluation of Quality Function to Comply with BS5750 - Part 1 |
| Gould Inc. | Manufacturing Plan for Fabrication Area |
| HB Switchgear Ltd. (TYH Ltd.) | Design Improvement Review of Solenoid-Operated D.C. Contactors |
| Holec Systemsen & Componenten BV (Eaton / Holec) | Critical Analysis |
| Imo Corporation | Critical Analysis of Military Vision Equipment Assembly Operations |
| Imo Corporation | Critical Analysis of Mechanical Equipment Problems and Implementation of Problem-Solving Teams |
| Kearney National | Implementation Assistance and Technology Review |
| Kearney National / COTO Wabash (Coto Technology) | Development of a Strategic Manufacturing Plan |
| Kemitron Electronics (Acquired by Merlin Circuit Technology) | Advice on Recognition Systems |
| Klippon Electrical Ltd. (AKA Weidmueller) | CAD/CAM Feasibility Study |
| Landis & Gyr GmbH | Analysis of Cost Reduction by Reducing the Number of Plants in Germany |
| Landis & Gyr GmbH | Analysis of Service Shop at Landis & Gyr |
| Landis & Gyr GmbH | Short Analysis of the Company NRI Buxtehude for Acquisition by Landis & Gyr |
| Landis & Gyr GmbH | Implementation of Restructuring Concept |
| Landis & Gyr GmbH | Implementation of New Organization Process in Sales Department |
| Leeds & Northrop Ltd. (Acquired by Honeywell) | Evaluation and Planning for Manufacturing Improvements |
| Leeds & Northrop Ltd. (Acquired by Honeywell) | Implementation of Manufacturing Improvements |
| Leeds & Northrup (Acquired by Honeywell) | Getting Back on Track Through Fundamental Change |
| Legrand (Pass & Seymour / Legrand) | Short Term Cost Reduction |
| Lucas Electrical & Electronics Sys. (TRW Automotive) | Feasibility Study and Planning Assistance with FMS for Rationalized Instrument Pack |
| Lucas Electrical & Electronics Sys. (TRW Automotive) | Vendor Management Project |
| Lucas Electrical Systems Ltd. (TRW Automotive) | Value Analysis |
| Membrain Ltd. | Overview of Current PCB Assembly and Test Operation |
| Merlin Gerin (Schneider Electric) | Industrialization of a New Product |
| Merlin Gerin (Schneider Electric) | Industrial Plan for Electrical Equipment Manufacture |
| Merlin Gerin (Schneider Electric) | New Building Location Study for High Volume Domestic Circuit Breaker Manufacturing System |
| Merlin Gerin (Schneider Electric) | Personnel Training on JIT Methods |
| Midwest Electric Mfg. Corp. | Manufacturing Improvements Program for Electrical Wiring Products |
| Morganite Special Carbons Ltd. | Developing and Implementing the Master Plan |
| Morganite Special Carbons Ltd. | Developing and Implementing the Master Plan |
| Murray-Ohio Manufacturing Co. (Esterline Technologies) | Critical Analysis of Operating Improvement Opportunities |
| NEI Reyrolle Ltd. (Reyrolle Pacific Switchgear Ltd.) | Concept Design of Auto-Recloser Unit Mechanism |
| NEI Reyrolle Ltd. (Reyrolle Pacific Switchgear Ltd.) | Continuation of Design of Steel Gas Enclosures for New Range of Switchgear |
| Nilsen Ind. Electronics Pty. | Assessment of Capital Expenditure Program |
| OnTrak Systems Inc. (Acquired by Lam Research) | New Product Introduction - A4000 CMP System |
| Pfisterer | Prestudy Logistics Systems of Electromechanical Parts |
| Pfisterer | Master Plan Definition for Manufacture of Electromechanical Parts |
| Pfisterer | Redesign of Production Logistics Functions for Manufacture of High Voltage Gear |
| Prolec S.A. de C.V. | Analysis of Tank Shop |
| Prolec S.A. de C.V. | Analysis of Tank Shop |
| Rectiphase (Subsidary of Schneider Electric) | Master Layout |
| Redpoint Thermalloy Ltd. | Manufacturing Strategy |
| Redpoint Thermalloy Ltd. | Manufacturing Strategy |
| Reyrolle Belmos | Evaluation of Industrial Control Gear Contract and Manufacturing Planning |
| Rockford Dynatorq | Critique of Operations for Cost Improvement Opportunities |
| Rogers Corp. | Manufacturing Operations Assessment |
| Rotring Werke | Development of a Product Strategy for an Electronic Drafting Machine ‘VIS-A-VIS CALC’ |
| Sachsenwerk Licht-und-Kraft AKG (VEM Sachsenwerk GmbH) | Critical Analysis of Medium Size Electrical Switch Gear Factory |
| Sachsenwerk Licht-und-Kraft AKG (VEM Sachsenwerk GmbH) | Critical Analysis for “Green Field Planning” of a New Regensburg Plant |
| Sachsenwerk Licht-und-Kraft AKG (VEM Sachsenwerk GmbH) | Development of Long-Term Planning for Process Organization and Production Organization |
| Siemens Aktiengesellschaft | Develop Advanced Manufacturing System for Turbine Shells |
| Siemens VDO | Critical Analysis |
| Siemens-Allis, Inc. (Allis Chalmers) | Relocation of Switchgear Division From West Allis to a New Location in North Carolina |
| Sola Electric Company (EGS Electrical Group) | Analyze/Recommend Paint System |
| Solatron Instrumentation (Schlumberger) | Planning of a New Facility for the Assembly of Electronic Instruments |
| Stadium Ltd. | Feasibility Study on Automated Handling of Plastic Injection Mouldings |
| Tayden Loudspeaker Systems | Design of a Membrane and Coil Driver Assembly for High Frequency Miniature Loudspeakers |
| Tayden Loudspeaker Systems | Design of a Membrane and Coil Driver Assembly for High Frequency Miniature Loudspeakers |
| Thorn ALI Lighting | Productivity Improvement Through 4D Cells |
| TRI Scan Ltd. | Design Study on a Fibre-Optic Coupling for IR Transmitting Systems for Vehicle Refuelling Points |
| TRT (Acquired by Harris Corp. / Microwave Communication Division) | Action Plan Follow-Up: Directional Radio Links |
| TRT (Acquired by Harris Corp. / Microwave Communication Division) | Action Plan Follow-Up for Manufacture of Directional Radio Links |
| TRT (Acquired by Harris Corp. / Microwave Communication Division) | Cost Audit and Action Plan |
| TRT (Acquired by Harris Corp. / Microwave Communication Division) | Action Plan Follow-Up: Directional Radio Links |
| TRT (Acquired by Harris Corp. / Microwave Communication Division) | Action Plan Follow-Up for Manufacture of Directional Radio Links |
| TRT (Acquired by Harris Corp. / Microwave Communication Division) | Cost Audit and Action Plan |
| United Technologies Automotive | Product/Market Opportunity Evaluation |
| Varian Associates Inc. | Machine Shop Analysis and Expansion/Improvement Guidelines |
| Varian Associates Inc. | APT Videotape Training Course |
| Wabash Magnetics | Electronics Assembly |
| Wabash Magnetics | Problem Solving Assistance |
| Wabash Magnetics | Training and Teambuilding |
| Whipp and Bourne Ltd. | Development of Improved Manufacturing Capability Using Advanced Manufacturing Technology |