| HVAC Equipment |
| Company | Project Description |
| Actionair Equipment Ltd. | Actionpac Feasibility Study |
| Actionair Equipment Ltd. | Redesign of Fusible Link System |
| Actionair Equipment Ltd. | Design of Trans Shield and Smoke Shield Products |
| Bronswerk - Refac | Production Improvement/Consolidation of Manufacturing and Assembly Into a New Location |
| Carrier | Improving Sheet Metal Supply at Tyler, TX |
| Carrier Commercial Refrigeration | MSD Product Line Move Assessment (Yuma, AZ & Waxahachie, TX) |
| Carrier Corp. | Implementation Assistance: Water Box Cell |
| Carrier Corp. | Cell Implementation |
| Carrier Corp. | Continued Assistance with TR-1 Cellular Manufacturing |
| Carrier Corp. | Continued Cellular Implementation |
| Carrier Corp. | Critique Proposed Expansion Plan for Canadian Plant |
| Carrier Corp. | Phase II: Master Plan |
| Carrier Corp. | Critique Client Plan to Combine Two Products from Two Plants |
| Carrier Corp. | Critical Analysis - Critique Carrier Plan and Set Direction for T1 |
| Copeland Corporation | Assembly Planning - CR/DR Compressors |
| Copeland Corporation | Concept Planning and Verification for Scroll Compressor Factory |
| Copeland Corporation | Audit of Manufacturing Systems for the New CR/DR Piston Machining |
| Copeland Corporation | Critique New Product Line |
| Copeland Corporation | Feasibility Study - Mufflers |
| Copeland Corporation | Develop Process for New Design Compressor Parts |
| Copeland Corporation | Long-Range Facilities Planning |
| Copeland Corporation | Assist In Planning of The New Facility to Produce CR/DR Compressors in Hartselle, AL |
| Copeland Corporation | Assist in Finding and Developing Offshore Vendors |
| Copeland Corporation | Productivity Improvement for Machining Copelametic Bodies 4R/6R |
| Copeland Corporation | New Process for Manufacturing CR/DR Aluminum End Bearing Housings |
| Copeland Corporation | Phase I: Develop Best Practices for Scroll Facilities |
| DWM Copeland GmbH (Copeland / Emerson) | Review of New Assembly Concept for Air Compressors |
| Eclipse Incorporated | Phase I: Process Optimization Program |
| Eclipse Incorporated | Detail Engineering and Implementation of the Process Optimization Program |
| Eclipse Incorporated | Help Identify and Correct Factors Causing Failsafe Valve to Fail |
| Eclipse Incorporated | Continuing Assistance With the Process of Resolving Failsafe Valve Failures |
| Eclipse Incorporated | Improvements to Current Valve Design |
| FKI Stone Boilers Ltd. | Improvements in Business Performance |
| FKI Stone Boilers Ltd. | Site Consolidation |
| Happel GmbH & Co. (GEA Happel GmbH) | Critical Analysis of Product Market Strategy |
| Happel GmbH & Co. (GEA Happel GmbH) | Turn Around Austrian Plant Through Restructuring Manufacturing Operations |
| Heatrae Sadia Heating Ltd. | CAD/CAM Feasibility Study |
| Ipsen Industries Inc. | Assistance to Improve Plant Layout and Material Work Flow |
| Kenmore Refrigeration Equip. UK | Advanced Manufacturing Technology for Refrigerator Evaporators |
| Kysor Industrial Corporation | Capital Plan Assessment |
| Kysor Industrial Corporation | Phase I: Defining the “As Is” |
| Lone Star Manufacturing Co. | Develop Manual Scheduling and Control System |
| Lone Star Manufacturing Co. | Short-Term Warehousing Improvements and Long-Term Facility Plan |
| Lone Star Manufacturing Co. | Plant Layout and Implementation Schedule |
| Myson Radiators Ltd. | Design Study to Improve Range of Radiators |
| Myson Radiators Ltd. | Improvements in Manufacturing Methods and Layout |
| Oy Uponor AB (Uponor Corporation) | Manufacture and Distribution Rationalization |
| Rotocold Ltd. (Jotek Ltd.) | Development of a Financially Justified AMT/Business Strategy |
| Steer & Co. Ltd. | Value Engineering for a Gas/Oil Fired Space Heater |
| Stelrad Bathroom Products Ltd. (Stelrad Radiators) | Engineering Services for Isle of Sheppey Facility |
| Stiebel Eltron GmbH & Co. KG | Critical Analysis: Low Cost Factory |
| Stiebel Eltron GmbH & Co. KG | Low Cost Factory |
| Stiebel Eltron GmbH & Co. KG | Implementation of Low Cost Factory |
| Stiebel Eltron GmbH & Co. KG | Implementation Assistance for Low-Cost-Factory |
| Stiebel Eltron GmbH & Co. KG | Logistic Concept for Waterheating Equipment Manufacturer |
| Stiebel Eltron GmbH & Co. KG | F & E Concept Workshop for Waterheating Equipment Manufacturer |
| Trane Company | MEOST Scoping Session |
| Trane Company | MEOST Testing and Specification Validation |
| Tyler Refrigeration Corp. | Process Improvement |
| York International | Feasibility Study of Plant Rationalization |
| York International Corporation | Continue Scenario Development and Feasibility Study |