| Industrial Equip., Machinery & Supplies |
| Company | Project Description |
| ABB Asea SpA | Brief Overview of Current Planning |
| Acco Babcock Inc. | Quick Hitters |
| Ace Machinery Co. Ltd. | Evaluation of Quality Function to Comply With BS5750 |
| Acma SpA | Audit of Layout Planning |
| Acrow Automation Ltd. | Improvement Overview |
| Acrow Automation Ltd. | Relocation Project |
| Acrow PLC | Assistance With Restructuring of Manufacturing Facilities |
| AEC Incorporated | Plant Layout and Operations Evaluation |
| AEC Incorporated | Review Audit Process |
| Ajax Fasteners Australia Ltd. (Nylex) | Assistance With the Development of a Business Strategy |
| Ajax Fasteners Australia Ltd. (Nylex) | Assistance in Creation of a Pilot JIT Fastener Cell |
| Ajax Fasteners Australia Ltd. (Nylex) | Factory Site Consolidation |
| Akron Brass Company | World-Class Feasibility Study |
| Alco Controls (Emerson Climate Technologies) | Develop Equipment Plan for Russian Project |
| Alfred Herbert Ltd. | Advanced Machining Feasibility Study |
| Alfred Herbert Ltd. | Profile Study to Identify Productivity Improvement by 50% |
| Alfred Herbert Ltd. | System Study to Develop Advanced Mfg. Systems for Spindles, Shafts, Sole Plates and Turrets |
| Alfred Herbert Ltd. | Facilities Planning - Heavy Flat Surfacing - ARMM |
| Alfred Herbert Ltd. | Seminar - Developing a Dynamic Equipment Policy |
| Allen Gears | Implementation Planning Assistance |
| Alliance Machine Systems Int'l (J&L Industries) | Machine Installation Analysis |
| American Fluorescent | Implementation of Productivity Improvements |
| Android Corporation | Processing Tank Parts for Mitsubishi 6" Horizontal Boring and Milling Machine |
| Ansaldo Sistemi Industriali | Improvement of Production System for Manufacture of Electric Motors |
| APT - C.E. Drayton | Sale of Video APT Programming Course |
| APV Baker Incorporated (APV Invensys) | Critical Analysis of Grand Rapids, MI and Goldsboro, NC Operations (Letter Report) |
| APV Baker Incorporated (APV Invensys) | Critical Analysis: Building a Stronger Unified Business |
| APV Baker Ltd. (APV Invensys) | Manufacturing Strategy |
| APV Baker Ltd. (APV Invensys) | Relocation Project Review |
| APV Baker Ltd. (APV Invensys) | Project Management Support |
| APV Crepaco Inc. (Invensys) | Implementation Planning for Reorganization |
| APV Crepaco Inc. (Invensys) | Lake Mills Study |
| APV Crepaco Inc. (Invensys) | Audit of Master Plan (Restructuring Efforts) |
| APV Crepaco Inc. (Invensys) | Continuing the Process of Ongoing Change |
| APV Crepaco Inc. (Invensys) | Continuing the Process of Ongoing Change (Sales/Marketing/Engineering Reorganization) |
| APV Crepaco Inc. (Invensys) | Continuing the Process of Ongoing Change |
| APV Crepaco Inc. (Invensys) | Continuing the Process of Ongoing Change |
| APV Crepaco Inc. (Invensys) | Continuing the Process of Ongoing Change |
| APV Crepaco Inc. (Invensys) | Continuing the Process of Ongoing Change |
| APV Crepaco Inc. (Invensys) | Restructure of Customer-To-Business-Unit Organization Interface (Inv. Sales, Marketing, Engineering) |
| APV Crepaco Inc. (Invensys) | Respond to Short Term Needs and Development of Sales/Marketing Framework |
| APV Hall Products Ltd. (APV Invensys) | Feasibility Study for Introduction of Computer-Aided Design and Manufacturing System |
| APV International Ltd. (APV Invensys) | Manufacturing and Facilities Strategy |
| APV International Ltd. (APV Invensys) | Assistance With Detailed Planning AMT Investments |
| APV International Ltd. (APV Invensys) | Manufacturing Control Systems Improvements |
| Arnold und Stolzenberg (Renold plc) | Reduction of Work In Progress |
| Arnold und Stolzenberg (Renold plc) | Implementation - Reduction of WIP for a Large Series Manufacturer of Precision Chains |
| Ashlow Ltd. (Siemens VAI) | Evaluation of Manufacturing Cost Reduction of Roller Guides |
| Atlas Copco Energas GmbH | Analysis of the System Coverage Survey of the Logistics Systems in Use at Atlas Copco Energas |
| Automation Tooling Systems Inc. (ATS) | Strategic Business Evaluation for Automated Tooling Systems Manufacturer |
| Automation Tooling Systems Inc. (ATS) | Continued Assistance with Organizational Development |
| Automation Tooling Systems Inc. (ATS) | Organizational Development |
| Automation Tooling Systems Inc. (ATS) | Development of Strategy |
| Babcock Textile Machines | Critical Analysis of the Present Situation of the Company |
| Babcock-BSH Inc. | Audit of Plans for New Radial Fans |
| Baker Perkins (APV Baker) | Creation of Autonomous Business Units at Petersborough |
| Baker Perkins Chemical Machinery | Factory Civil and Service Modifications for a New Manufacturing Cell |
| Baker Perkins Chemical Machinery | Factory Development Program |
| Baker Perkins Chemical Machinery | Factory Development Program |
| Baker Perkins Chemical Machinery | Factory Development Program |
| Baker Perkins Holdings Ltd. | Critique of Manufacturing Strategy |
| Baker Perkins Holdings Ltd. | Assistance In Planning and Implementing a Manufacturing Control System |
| Baker Perkins Holdings Ltd. | Detail Design Work in Association with Factory Reorganization |
| Baker Perkins Holdings Ltd. | Implementation of a Control System Manufacturing Facility |
| Baker Perkins Pty Ltd. | Assistance With A Business Plan |
| Baker Perkins Pty Ltd. | Project Management Network and Reporting Data |
| Balcke-Durr AG | Improvement of Production Planning and Production Control in the Neubeckum Plant |
| Balcke-Durr AG | Installation of Efficient Project Management Organization for Boiler Design and Construction |
| Balcke-Durr AG | Critical Analysis - Frankenthal Plant |
| Balcke-Durr AG | Critical Analysis - Frankenthal Plant |
| Balcke-Durr AG | Support in Strategic Planning for Pump Production - Frankenthal Plant |
| Balcke-Durr AG | Restructuring of Manufacturing Area in the Neubeckum Plant |
| Balcke-Durr AG | Support In Strategic Planning For Pump Production - Frankenthal Plant |
| Balcke-Durr AG | Strategic Planning - Frankenthal Plant |
| Balcke-Durr AG | Strategic Planning - Frankenthal Plant |
| Balcke-Durr AG (SPX Cooling Technologies) | Improvement of Order Management in Apparatus Engineering |
| Band-It Company (Idex Corp.) | Assist in Designing Removable Housing Clamp |
| Barber-Greene Company | Detail Facility Planning and Cell Implementation |
| Barber-Greene Company | Critical Analysis (Feasibility) Study |
| Barber-Greene Company | Phase III: Total Facility Improvement Implementation |
| Barber-Greene Company | Facility Implementation |
| Barnes International Inc. | Capacity Strategy and Cost Reduction Program |
| Barnes International Inc. | Analyzing Finishing Operations |
| Barnes International Inc. | Assess Progress Toward Implementation at Arlington Plating |
| Barodyne Inc. | Prepare Preliminary Plan for New Manufacturing Facility to Produce CY Series Air Ends |
| Battenfeld Blowmolding Machines | Critical Analysis of Potential Tool Modularization Program |
| Battenfeld Blowmolding Machines | Developing a Modularization Plan |
| Battenfeld Blowmolding Machines | Engineering Drawings for Heads and Extruder Modules |
| BC Tools Ltd. | Improvements to Manufacture of Textile Cutting Blades |
| BCL Shorko Ltd. | Assistance with the Preparation of Concept Manufacturing Plan for Material Handling/Storage |
| BCL Shorko Ltd. | Project Planning of Computer-Integrated Automatic Handling and Storage Facility at Swindon |
| Beloit Sorel Walmsley Ltd. | Manufacturing Study for Consolidation of Machine Shops |
| Bemrose Flexible Packaging | Review of Operational Reliability of an Extrusion Coating Plant |
| Benerson Corporation (Acquired by General Electic) | Engineering Assistance with Design of Special CNC Machining Center |
| Bifurcated & Tubular Rivet Co. Ltd. | Value Engineering Exercise on a Portable Riveting Gun |
| Black Brothers Co. | Tooling System Planning Assistance |
| Black Brothers Company | Roundtable Discussion on Steps to Take for NC Turning |
| Black Clawson Company (Black Clawson Converting Machinery) | Product/Process Technology Review |
| Black Clawson Company (Black Clawson Converting Machinery) | Data Gathering for Master Planning |
| Black Clawson Company (Black Clawson Converting Machinery) | Assist in Identifying Areas for Improving Productivity and Profit Margins |
| Bliss Production Machinery | Development of Machine Tool Requirements for New Facility In Ireland |
| Bliss Welded Products Ltd. | Assistance with Revival Plan |
| Bliss Welded Products Ltd. | Implementation of Corporate Plan |
| BOSS Manufacturing Ltd. | Critical Analysis and Launch of Action Plan |
| Bristol Erickson Ltd. (Forkardt) | Preparation of a Financially Justified Manufacturing Plan Incorporating Advanced Technology |
| Britweld Limited | Phase II: Design of TIG Welding Power Source |
| Bullard Company | Milling Improvement Study - ARMM |
| Butler Newall Machine Tool Ltd. | Initial Study to Assess Investment Options for Machining Activities |
| Butler Newall Machine Tool Ltd. | Study: Quality Assurance BS5750 - Part 1 |
| Buttner Schilde Haas (Grenzebach BSH) | Critical Analysis of the Wood Processing Machine Division |
| Carlson Tool & Mfg. Corp. | Layout Development |
| Carmet Company | NC Lathe Machine Analysis |
| Carmet Company | Facilities Improvement Study for Modernization of Three Cutting Tool Plants in the Detroit Area |
| Chicago Pneumatic Tool Company | Assist in Starting Up Temporary Fabrication/Assembly Plant for Rotary Drill Rigs in Sherman, TX |
| Chicago Pneumatic Tool Company | Analysis of Air End Rotor and Rotor Seal Manufacturing Problems |
| Chicago Pneumatic Tool Company | Productivity Improvement Study of Single/Screw Air-End Manufacturing System |
| Chicago Pneumatic Tool Company | Assist in Installing a New Bearing in a Star Grinding Machine |
| Cincinnati Inc. | Facilities Improvement Study for Machining Major Members of Medium Mechanical Press Brakes |
| Cincinnati Milacron Inc. (Milacron) | Advanced Assembly Plant Project |
| Cincinnati Milacron Inc. (Milacron) | Feasibility Study of Machine Tools for Avco Lycoming Manufacture of Tank Engine Parts |
| Cincinnati Milacron Inc. (Milacron) | Assistance with Product, Plant and Site Development Plans |
| Cincinnati Milacron Inc. (Milacron) | Sourcing Exercise |
| Cincinnati Milacron Inc. (Milacron) | Cost Reduction on 5VC Machine Center |
| City Machine & Tool | Facility Planning for Sheet Metal and Fiberglass Stamping |
| Clark Brothers Company (Dresser-Rand) | Tech-Nomic Cutting Tool Study |
| Clark Maschinenfabrik GmbH | Development of an EDP System for the Factory of the Future |
| Clark Maschinenfabrik GmbH | Implementation of JIT Production Concept |
| Clark Maschinenfabrik GmbH | Analysis of the Implementation of the Proposed PPS System into the Factory of the Future |
| Clark Maschinenfabrik GmbH | Concept for the Factory of the Future |
| Clark Maschinenfabrik GmbH | Factory of the Future Implementation Planning |
| Continental Can Co., Inc. (U.S. Can Co.) | Critique Proposed Manufacturing Layout for Can Ends/Develop Material Handling Methodology |
| Continental Can Co., Inc. (U.S. Can Co.) | Phase V: Implementation Management Information System |
| Continental Can Co., Inc. (U.S. Can Co.) | Planning Inventory Management |
| Continental Can Co., Inc. (U.S. Can Co.) | Understanding Situation at Continental |
| Continental Can Co., Inc. (U.S. Can Co.) | Facility Planning - Phase I: Diagnosis and Critical Analysis |
| Continental Can Co., Inc. (U.S. Can Co.) | Phase II: Facility Improvement Planning and Implementation |
| Continental Can Co., Inc. (U.S. Can Co.) | Manufacturing Implementation Assistance |
| Continental Can Co., Inc. (U.S. Can Co.) | Design Assessment |
| Conval Corporation | Facilities Upgrade for Valve Mfr. at Conval (Wadsworth, OH) and Lunkenheimer Co. (Cincinnati, OH) |
| Cooper Energy Services (Cooper Compression) | Manufacturing Capacity Planning |
| Crabtree of Gateshead Ltd. | 1200 Press Electrical Wiring Improvement |
| Cresuot-Loire S.A. | Task Group Assistance - Production System for Separators-Orengoi Project |
| Creusot Loire S.A. | |
| Creusot-Loire S.A. | Critical Analysis of Investment Plan |
| Creusot-Loire S.A. | Machine Shop Productivity Improvement |
| Creusot-Loire S.A. | Analysis of Industrial Turbine Manufacturing Shop |
| Creusot-Loire S.A. | Manufacturing System Study for Production of Main Stationary Parts of Steam Turbines |
| Creusot-Loire S.A. | General Diagnostic of the Plant |
| Creusot-Loire S.A. | Welding Specifications and Documents for Texaco Project |
| Creusot-Loire S.A. | Cost Reduction Project - Heat Exchanger Collectors |
| Creusot-Loire S.A. | Re-Installation Accumulator Fabrication Line |
| Creusot-Loire S.A. | Improve Structure Efficiency |
| Creusot-Loire S.A. | Assistance with Texaco Project |
| Crown Windley Ltd. (Eley Metrology) | Review of Machine Tools and Methods |
| Crown Windley Ltd. (Eley Metrology) | Planning Assistance With the Transfer of Sine Table Production |
| Cummins Power Generation (Onan Corp.) | Profile Evaluation of Diesel Engine Production |
| David Brown Gear Ind. Ltd. (Textron) | Creating Effective Teams for Cell Manufacture at Keighley Gear |
| David Brown Gear Ind. Ltd. (Textron) | Critique of Pump Manufacturing Layout |
| David Brown Gear Ind. Ltd. (Textron) | Business and Facilities Strategy |
| David Brown Gear Ind. Ltd. (Textron) | Assistance With Manufacturing Facilities to a Green Field Site |
| David Brown Gear Ind. Ltd. (Textron) | Business and Manufacturing Strategy |
| David Brown Gear Ind. Ltd. (Textron) | Review of Production Control Techniques and Purchasing Procedures |
| David Brown Gear Ind. Ltd. (Textron) | Develop Initial Block Layouts for Submission to Local Government |
| David Brown Gear Ind. Ltd. (Textron) | Assistance With Layouts For Balli and Stanmore Sites (A$9000) |
| David Brown Gear Ind. Ltd. (Textron) | Assistance With Implementation of a Reorganized Manufacturing Facility |
| David Brown Gear Ind. Ltd. (Textron) | Company Recovery Program - Critical Cost Analysis Assignment |
| David Brown Gear Ind. Ltd. (Textron) | Company Restructuring |
| David Brown Gear Ind. Ltd. (Textron) | Refurbishment of Park Gear Works |
| David Brown Gear Ind. Ltd. (Textron) | Planning and Project Management Assistance |
| David Brown Gear Ind. Ltd. (Textron) | Project Management Assistance - Implementation of Fairey Consolidation |
| David Brown Gear Ind. Ltd. (Textron) | Assistance With Project Management |
| David Brown Sadi (David Brown) | Assistance With the Development of an Outline Layout and Facilities Plan |
| Davis-Standard (Division of Crompton) | Productivity Improvement Study |
| Davy-United Engineering | Profile Study for Steel Rolling Machinery Manufacture |
| Dedini S.A. | Facility Expansion Plan for Turbines and Reducers |
| Dedini S.A. | Facility Planning and Expansion - Boiler Shop |
| Dedini S.A. | Productivity Improvement and Facility Expansion for Sugar Mills and Citroen Reducers |
| Dedini S.A. | Technical Assistance - Purchase of Large Special Training Machine |
| Delapena Honing Equipment Co. (Gehring Delapena) | Extension of Computer-Aided Facilities in Production Management |
| Derwent Measurement & Ctrl. Ltd. | Advice on Launching of New Product in USA |
| Diager S.A. | Manufacturing Management Improvement |
| Diecraft Australia Pty. Ltd. (Tupperware) | Develop Logistics System for 4D Cells |
| D-M-E Company | Development & training for Kanban Replenishment System |
| D-M-E Company | Developing Performance Modeling Capability & Identifying Performance Gaps |
| DME Milacron | Assess Opportunities for Improvement |
| DME Milacron | Lean Enterprise Implementation and Restructuring |
| Dowty Meco Ltd. (Joy Mining) | Evaluation of Options Available to Consolidate and Improve Manufacturing Resources |
| Dowty Meco Ltd. (Joy Mining) | Technical Specifications |
| Dowty Mining Equipment Ltd. (Joy Mining) | Assistance With Introduction of Technological Changes |
| Dowty Mining Equipment Ltd. (Joy Mining) | Project Management Assistance - Valve Block FMS |
| Dowty Mining Equipment Ltd. (Joy Mining) | Project Management Assistance with Implementation of Flexible Manufacturing System |
| Eaton Corporation | Phase II: Design Specification for CIM in the Focused Factory |
| Eaton Corporation | Phase III: Evaluation and Selection of CIM Systems in the Focused Factory |
| Eaton Corporation | Review of Fletcher Upgrade |
| Eaton Corporation | Participation in Meetings in Japan and Preparation of Proposal |
| Eaton Corporation | Project Meeting Attendance and Opinion |
| Eaton Corporation | Phase III: Monthly Audit and Critique |
| Eaton Corporation | Streamline Operations at Saginaw |
| Eimco BSP (Envirotech) | Planning/Balancing of Facilities at Eimco BSP-SLC and Goslin Birmingham |
| Elco Industries | Factory Streamlining |
| Electroforms & Components Ltd. | Pre-Assessment Audit Prior to Approval by BSI |
| Electroforms & Components Ltd. | Evaluation of Quality Function to Comply with BS5750 - Part 2 |
| Emhart Corporation (Emhart Glass / Bucher Industries) | Cell Manufacturing Feasibility Study |
| Emhart Corporation (Emhart Glass / Bucher Industries) | Critique Facility Rationalization Plans for Farrell General Machinery Division |
| Emhart Corporation (Emhart Glass / Bucher Industries) | Analyze Production Flow/Develop Alternate Equipment Layouts to Accommodate Production Flow |
| Emhart Corporation (Emhart Glass / Bucher Industries) | Optimize Operations at the Glass Machinery Division |
| Emhart Corporation (Emhart Glass / Bucher Industries) | Identify Opportunities for Facilities Rationalization in Four Divisions |
| Engel, Ludwig KG | Concept Planning - New Automated Fab Shop |
| Equipamentos Villares S.A. | Evaluate Qualifications and Technical Resources to Manufacture Locomotives |
| Equipamentos Villares S.A. | Cutting Tool Selection - Machine Tools for the EQ-2 Factory |
| Escher-Wyss AG (Sulzer) | Small Machine Shop Improvement Study |
| Exact Machine Company Inc. | Technical Assistance |
| F.J. Stokes | System Study on Manufacture of Vault Doors, Chests and Elevator File Parts |
| Falk Corporation | Tech-Nomic Study - Cutting Tool Study |
| Falk Corporation | Standard Products Feasibility Study/Preliminary Planning |
| Faun AG | Concept for a Low Cost JIT-Factory for Automotive Cranes |
| Fielding & Platt Ltd. | Subcontractor Search Assignment |
| Fisons Environmental Equipment | Feasibility Study - AMT |
| Flair Corporation (Pahwa Enterprises) | Review Capital Expenditure Request |
| Flair Industrial Air (Pahwa Enterprises) | Cell Implementation |
| Flair Industrial Air (Pahwa Enterprises) | Facility Rationalization and Implementation—Phase I |
| Galileo Vacuum Tec (Gallileo Vacuum Systems) | Business Development Plan for Manufacture of Rotary Pump |
| Gardner Denver Company | Conceptual Plant Layout and Equipment Transfer From York, PA, to Quincy, IL |
| Gardner Denver Company | Analysis of Milling Practices to Determine Adequacy of Machines |
| Gardner Denver Company | Audit of Cutter Grinding and Cutting Tools Programs |
| Gardner Denver Company | Productivity Improvement for Large Milling Machines |
| Gardner Denver Company | Reciprocating Compressor Relocation and Pump Rearrangement |
| Gardner Denver Company | Layout Plan for New Facility to Manufacture Screw Compressor Products |
| Gardner Denver Company | Development of Training Program for Good Milling Practices |
| Gardner Machine Company (Gardner Disc Grinders & Abrasives) | Preliminary Critical Analysis |
| Gast Manufacturing Corporation | Develop Cost Measurement Tools |
| GEA Canzler GmbH (BUSS-SMS-Canzler) | Critical Analysis: Reduction of Manufacturing Costs |
| GEA Waermetauscher (GEA Happel Wieland) | Implementation of Cost Reduction Program for Gaspoltshofen Plant |
| Gear Products Division | Applying Just-In-Time to Gear Business from Order Entry to Shipping |
| Gear Products Division | Develop and Implement an Action Plan to Improve Time Shipments |
| George Hantscho Company, Inc. | Assist in Putting Together Three-Year Business Plan for Corporate Board of Directors |
| George Hantscho Company, Inc. | Overview of Evaluation Work to Purchase New Horizontal Boring Machine |
| George Hantscho Company, Inc. | Define Plan for Expanding Data Processing Capabilities |
| George Hantscho Company, Inc. | Implementation of Giddings & Lewis Numericenter |
| George Hantscho Company, Inc. | Post Audit of Machining Center Operation |
| George Hantscho Company, Inc. | Define Equipment Needed to Double Volume and Develop Plant Layout for Efficient Operation |
| George Hantscho Company, Inc. | Implementation of Scheduling System |
| George Hantscho Company, Inc. | Productivity Improvement Side Frames and Bases |
| Gleason Machine (Gleason Corporation) | Two-Day CIM Seminar |
| GM Fanuc Robotics Corp. (Fanuc) | Counsel and Assist in Developing a CIM Demonstration Factory |
| GM Fanuc Robotics Corp. (Fanuc) | Develop a Detailed Project Schedule for an FMS Design and Implementation |
| Goyen Controls Pty Ltd. (Tyco Environmental Systems) | Manufacturing Improvement Plan |
| Greenwood Airvac | Blueprint for Company Systems and Procedures |
| Harnischfeger Corp. (P&H Mining Equipment) | Capacity Evaluation for Large Components |
| Harnischfeger Corp. (P&H Mining Equipment) | Develop Manufacturing Plan That Provides Best Cost Reductions and Systematic Implementation |
| Harnischfeger Corp. (P&H Mining Equipment) | Overview and Implementation Assistance with Facilities Expansion |
| Harnischfeger Corp. (P&H Mining Equipment) | Implementation - Expansion Program |
| Harnischfeger Corp. (P&H Mining Equipment) | Review Revised Shop Layout and Plan Next Expansion Step |
| Harnischfeger Corp. (P&H Mining Equipment) | Facilities Planning for an Expanded New Tin Shop |
| Harnischfeger Corp. (P&H Mining Equipment) | Facility Utilization Plan of Acme Engineering |
| Harnischfeger Corp. (P&H Mining Equipment) | Critique Manufacturing Facilities for Work Flow and Material Handling |
| Harnischfeger Corp. (P&H Mining Equipment) | Improvement of Material Handling and Storage - Oak Creek Plant |
| Harnischfeger Corp. (P&H Mining Equipment) | Cab Plant and Warehouse Consolidation - Planning Critique |
| Harnischfeger Corp. (P&H Mining Equipment) | System Study for Hole-Drilling on the Overhead Crane Bridge Assembly Floor |
| Harnischfeger Corp. (P&H Mining Equipment) | Process Planning for Omega Cranes |
| Haycock Gauge & Tool Co. Ltd. | Feasibility Study for Computer-Aided Production Management |
| Heenan Drives Ltd. (FKI) | Machine Shop Improvements |
| Heenan Drives Ltd. (FKI) | Implementation of Sword |
| Heenan Drives Ltd. (FKI) | Manufacturing Methods for New Motivator Model |
| Hilti Steel Industry Products | Analysis and Comments - Machine Shop Proposal |
| Hilti Steel Industry Products | Alternative Solutions to Commercial Problems |
| Hilti Steel Industry Products | Feasibility Analysis of Purchasing the Conmold Co. |
| HLF Ltd. | Feasibility Study - AMT Part 1: Automated Saw Mill |
| HLF Ltd. | Rationalization Study |
| HLF Ltd. | Design Rationalization |
| Hoover Ball & Bearing Co. (Hoover Precision Products) | Assistance With the G222 Cost Reduction Program |
| Houdaille Hydraulics | Implementation Assistance - Automated Assembly |
| Houdaille Hydraulics | Productivity Improvement and Facility Plan - Viscous Torsional Vibration Dampers |
| Houdaille Hydraulics | Implementation Help with Special Manufacturing Problems |
| Huwood Limited (Continental Conveyor Ltd.) | Layout Review |
| Huwood Limited (Continental Conveyor Ltd.) | Phase I: Assistance With Implementation of Focus Factories |
| Huwood Limited (Continental Conveyor Ltd.) | Assistance With Planning and Implementation of Improvements to Information Systems |
| Huwood Limited (Continental Conveyor Ltd.) | Manufacturing Development Plan |
| Huwood Limited (Continental Conveyor Ltd.) | Business and Manufacturing Strategy |
| Huwood Limited (Continental Conveyor Ltd.) | Rose Forgrove Factory - Investigation |
| Huwood Limited (Continental Conveyor Ltd.) | Evaluation of Heavy-Duty Roller Design and Manufacturing Methods to Reduce Costs |
| Huwood Limited (Continental Conveyor Ltd.) | Task Force Activities |
| Hydro-Line Inc. (Eaton / Hydro-Line) | Evaluation of Val Tro Operations In Italy |
| Hydro-Line Manufacturing Co. (Eaton / Hydro-Line) | Assessing Production Resources |
| Hydro-Line Manufacturing Co. (Eaton / Hydro-Line) | Evaluation of Val Tro Operations In Italy |
| Hydro-Line Manufacturing Co. (Eaton / Hydro-Line) | New Plant Layout |
| Hydro-Line Manufacturing Co. (Eaton / Hydro-Line) | Analysis of Acquisition |
| Hydro-Line Manufacturing Co. (Eaton / Hydro-Line) | Implementation Assistance - Move to New Facilities |
| Illinois Tool Works Inc. | Design Keyboard Assembly Line |
| Illinois Tool Works Inc. | Review Cell Plan-Hob Division |
| Illinois Tool Works Inc. | Evaluate Off-Line Key Topping |
| Illinois Tool Works Inc. | Sealed Switch Department Cost Reduction |
| Illinois Tool Works Inc. | Recommend Solutions for Switch Assemblies and Molded Key Top Mfg. and Tolerence Problems |
| Industries Romi S.A. (Romi) | Facility Expansion Plan - Heavy Machine Shop |
| Ingersoll Cutting Tool Co. | Feasibility Study for Computer-Assisted Manufacturing Control |
| Ingersoll Cutting Tool Co. | Master Plan for Manufacturing Area |
| Ingersoll Cutting Tool Co. | Investigate Feasibility of Manufacturing Blade Blanks Using Powdered Metal Concept |
| Ingersoll Cutting Tool Co. | Blade Line Facilities Planning Study |
| Ingersoll Cutting Tool Co. | Facilities Planning and Site Utilization Project |
| Ingersoll Cutting Tool Co. | System Study to Improve Production Performance of Face Mills and Arbor Cutters |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | System Study of Automatic Dispatch Conveyor System - IMC Training Exercise |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | CAD/CAM Study |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Weld Shop Planning for Additional Capacity |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Maintenance System Study for Heavy Machine Shop |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Tooling System Development |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Material Control Study of Light Machine Shop |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Caterpillar Engine Block Line Simulation |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Simulation of Caterpillar Engine Block Line |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Computer Simulation of Pontiac 4-Cylinder Block Line |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | FMS Tool Management System Simulation |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Facilities Planning for New Fabrication Shop |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Determine Market for Piston Machine |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Market Study of Jet Engine Business at GE, United Technologies and Pratt & Whitney |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Project Management/NC Programming Support - IMMCo HPM Shop Order 25672 Using Compact 2 |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Updating DeVlieg Finish Boring Tools |
| Ingersoll Milling Machine Co. (Ingersoll Machine Tools) | Training Program Study for Standard Mill Practices for Large Mill Department |
| Ingersoll-Rand Italiana SpA | Detailed Planning for Capital Equipment Request Development |
| Ingersoll-Rand Italiana SpA | Master Plan/As-Is Simulation |
| Ingersoll-Rand Italiana, SpA | Visit Milan, Italy, Operation To Develop Proposal For Master Plan |
| International Tool | Evaluate Manufacturing Capability and Advise Potential Buyer of Company |
| IPM Corporation | Oil Pump Gears - Analysis of Secondary Operations |
| IRD Mechanalysis Ltd. (Rockwell Automation) | Crankshaft Balancing Machine Project |
| ITW Woodworth (ITW Workholding) | Critical Analysis |
| J.B.Thorne & Sons Ltd. | Assistance with the Development of a Business Strategy |
| J.H. Williams Ind. Products | Improve Product Shipments |
| James Howden & Co. (HowdenBuffalo) | Critique of Plans - Wind Turbine Blades |
| John Brown Automation Ltd. | Outline Proposal for Engine Assembly Facilities |
| John Brown Automation Ltd. | Specifications of Engine Assembly Lines |
| John Brown Automation Ltd. | GAX Proposal |
| Johnson-Reynolds Mfg. Co. | Gear Inspection and Diagnosis |
| Jones & Shipman Plc | NC Programming Preparation |
| Jones & Shipman Plc | Evaluation of Quality Function to Comply with BS5750 |
| Joy Manufacturing (Joy Mining Machinery) | Critique Joy Planning Work |
| Jungheinrich Maschinenfabrik GmbH | Critical Analysis as Basis for the Reorganization of Fork Lift Truck Business |
| Jungheinrich Maschinenfabrik GmbH | Reorganization of Fork Lift Truck Business |
| Jungheinrich Maschinenfabrik GmbH | Implementation: Reorganization of Fork Lift Truck Business |
| Kinney Vacuum Co. (Acquired by Tuthill Corp.) | Machine Shop Critique and Productivity Improvement Project |
| Klockner Moeller GmbH (Iveco) | Concept Planning for Future Factory of Programmable Control Units |
| Klockner Moeller GmbH (Iveco) | Manufacturability Analysis of New Design of Programmable Control Units |
| Knight Industries Inc. (Dresser-Rand) | Machine Shop Improvement and Expansion |
| Krupp Industrietechnik GmbH | Critical Analysis of New Planning for Vehicle Crane Production and Assembly in Wilhelmshaven |
| Krupp Industrietechnik GmbH | Adaptation of Plant Grevenbroich to Future Requirements |
| Lake Shore Inc. | Fabrication Facility Plan |
| Lake Shore Inc. | Manufacturing Capabilities and Process Review for New Facility To Be Located in Rhinelander, WI |
| Lawrence Brothers Inc. | Evaluate Packaging Program |
| Lawrence Brothers Inc. | Hinge Stress Evaluation |
| Lawrence Brothers Inc. | Evaluation of Commercial Ball Bearing Door Hinge |
| Litton UHS (Acquired by HK Systems) | Design and Prepare 3-D Model of Proposed Machine Tool Plant |
| Lummus Industries Inc. (Lummus Corp.) | Joint Venture With Rugby - Achieving World Class Performance |
| Lummus Mackie Ltd. | Joint Venture With U.S. - Achieving World Class Performance |
| M.A.N.-Wood Industries | Shop Scheduling and Control System |
| MAN GHH Krantechnik GmbH | Business Plan for Crane Division |
| MAN GHH Krantechnik GmbH | Audit of the Business Plan for Crane Division |
| MAN Roland Incorporated | Phase I: Identify and Analyze Critical Plant Consolidation Issues |
| MAN Roland Incorporated | Review of Sheet Division Consolidation into Stonington Facility |
| MAN Unternehmensbereich | Audit of MAN Layout for Small Parts |
| MAN Unternehmensbereich | Manufacturing Concept for Steam Turbine Blades |
| MAN-GHH Sterkrade GmbH (MAN Turbo AG) | Critical Analysis of New Planning of Turbo Machine Assembly and Component Assembly |
| MAN-GHH Sterkrade GmbH (MAN Turbo AG) | Concept Design of Production Planning and Control System for the New Turbine Factory |
| MAN-GHH Unternehmensbere | First Step of Implementation Production Planning and Control Concept for the Turbo Machine Div. |
| MAN-GHH Unternehmensbere | Detail Planning of New Turbine Shop |
| Mannesmann AG | Technology Transfer Feasibility Study for Gaslift Equipment |
| Maschinenfabrik Heid AG (Heid) | Development of a Customer Servicing System Support/Logistics for New Machine Tool Plant |
| Maschinenfabrik Heid AG (Heid) | Concept of Factory for the Future for Turning Machines |
| Maschinenfabrik Heid AG (Heid) | Reorganization of Company (Audit of Implementation) |
| Maschinenfabrik Heid AG (Heid) | Implementation Support for the New Factory |
| Maschinenfabrik Heid AG (Heid) | Implementation Support for the New Factory |
| Maschinenfabrik Heid AG (Heid) | Company Concept Evaluation for Submission to Austrian Ministry of Finance |
| Maschinenfabrik Liezen | Implementation of Previously Developed Business Concept for Crushers |
| Mecanique Industrie Chimie (MIC) | Plant Critical Analysis |
| Metal Box Engineering (Carnaud Metalbox Engineering) | Evaluation of Quality Function to Comply with BS5750 - Part 1 |
| Midland-Ross Corporation | Evaluation of Methods, Tooling, Support and Location for Gray Planer Mill and Lucas Boring Bar |
| Midland-Ross Corporation | Completion Audit of Special Machine Tooling Equipment |
| Midland-Ross Corporation | Refine Special Machine Concepts for Manufacture of Thin Wall Conduit (See Also 59491) |
| Midland-Ross Corporation | Profile Study for Consolidation of Dover and Somerset Manufacturing Facilities |
| Midland-Ross Corporation | Compressor Review - Processing and Design Manufacturability |
| Midland-Ross Corporation | Profile Study of Plan to Upgrade the Manufacture of Fittings for Thin-Walled Conduit |
| Midland-Ross Corporation | Governor Performance Feasibility |
| Milacron, Inc. | Lean Enterprise Implementation Support |
| Milacron, Inc. | Implementation Planning for Michigan & Ohio Facility Consolidation (Uniloy) |
| Milacron, Inc. | Project Management Support - Uniloy Consolidation |
| Minster Machine Co. | Layout Review |
| Minster Machine Co. | Identify/Create Manufacturing Node Definition |
| Minster Machine Co. | Development of Manufacturing Plans |
| Molins Machine Co. | Acquisition of Manufacturing Work From U.S. Sources |
| Molins Plc | Survey of FMS Systems in the USA |
| Molins Plc | FMS Market Update in the USA |
| Monarch Marking Systems | CADAM Operation and Implementation Demonstration at IMMCo |
| Moore Response Marketing Services (Division of RR Donnelley) | Mundelein Plant Productivity Audit |
| Moore Response Marketing Services (Division of RR Donnelley) | Waste and Makeready Cost Reductions |
| Moore Response Marketing Services (Division of RR Donnelley) | Implementation of Performance and Accountability Measures |
| Niagara Machine & Tool Works | Split Table Utilization Study ARMM |
| Nordberg Group (Metso Minerals Oy) | Concept & Implementation of Forecast System & Follow-Up of Previous Actions/Rock Crushers |
| Nordberg, Inc. (Metso Minerals Oy) | Business Redesign |
| Nordberg, Inc. (Metso Minerals Oy) | Continuation of 67195: Business Redesign |
| Nordberg, Inc. (Metso Minerals Oy) | Per Diem Services |
| Oil Coolers & Compressors Ltd. | Study: Redesign of Heat Exchanger |
| P & L Systems Ltd. | Value Engineering Study for a New Design of Food Farming Equipment |
| Pampus GmbH (Saint-Gobain Performance Plastics) | Harpoon Presentation Combined with Proposal for Strategic Cost Reduction |
| Peddinghaus Industries, Inc. (Peddinghaus Corp.) | Joint Client With Mizen Engineering: Arbitration Services Regarding Tests on a ‘Beam-Line’ Drill |
| Peerless Engineering Co., Inc. | Review Manufacturing Process for Blowout Preventer Parts |
| Peradin Ltd. | Development and Implementation of a Manufacturing Strategy and Site Consolidation |
| Picanol NV | Assembly Shop Concept |
| Picanol NV | Assistance With Implementation of a New Assembly Shop |
| Picanol NV | Assembly System Specifications |
| Picanol NV | Overview of Short- and Long-Term Manufacturing Facilities Plan |
| Picanol NV | Phase I: Critical Analysis/Machining Department - Phase II: Machine Cells Study - Phase III: Implement |
| Picanol NV | Phase I: Spare Parts Analysis |
| Picanol NV | Phases II and III: Spare Parts Analysis |
| Picanol NV | Short-Term Improvements |
| Picanol NV | JIT Component Procurement and Spare Parts Management |
| Powermatic Houdaille Inc. (WMH Tool Group) | Machine Shop Facility Improvement |
| Powermatic Houdaille Inc. (WMH Tool Group) | Post-Audit of Productivity Improvement Project |
| Precision Twist Drill Co. | Phase I: Diagnosis and Critical Analysis Information Systems and Facility Improvements |
| Precision Twist Drill Co. | Phase II: Continued Assistance in Systems and Operational Improvements |
| Precismeca Gesellschaft | Brief Critical Analysis of the Strategic Investment Plan |
| Precismeca Saverne | Critical Analysis of Conveyor Roller Operations |
| Pressed Steel Tank | Facility Critique |
| Protectoseal Company, The | Diagnostic Study |
| Provincial Crane | Facility Improvement - Fabrication Shop and Evaluation of 5" NC Horizontal Boring Bar Problems |
| PSM Fasteners Ltd. | Opportunity Audit |
| Reel-O-Tech Ltd. (Acquired by Autoreel Lt.d) | Review of Initial Design Concepts for a New High Speed Rewinding Machine for Electrical Cable |
| Reishauer Ltd. | Profile Study for Grinder Manufacture |
| RHP Industrial Bearings | Critique of Consolidation Plans |
| Rite-Hite Corporation | Establishing a Business Data Base |
| Robinson Wadkin (Wadkin Ultracare Ltd.) | Feasibility Study for Supply of an Automated Sawmill to Kibblewhite & Blackmur |
| Robotec Ltd. | Design of a Pick and Place Palletizer |
| Rockford Products Corp. | Cost Reduction and Modernization of Tooling Operations |
| Rockford Products Corporation | Analysis of Tooling Operations |
| Rockwell Graphic Systems (Goss Int'l) | FMS Study of Cubic Parts |
| Rockwell International (Rockwell Automation) | Global Operations Cost Reduction Effort |
| Rockwell International (Rockwell Automation) | APT Videotape Training Course |
| Rockwell International (Rockwell Automation) | APT Videotape Training Course |
| Rockwell International (Rockwell Automation) | APT Videotape Training Course |
| Romheld GmbH Frudrichshut | CAD/CAM Implementation |
| Roper Industries (Metrix) | Phase II: Business Consolidation/Optimization Implementation |
| Roper Industries (Zetec) | Developing an Asset Optimization Plan & Business Case for Zetec |
| Roper Industries (Zetec) | Phase II: Business Consolidation/Optimization Implementation |
| Roper Whitney Company | Competitive Base Analysis |
| Roper Whitney Company | Productivity Improvement Plan |
| Safety Socket Screw Corp. (VTL Automotive) | Developing Effective Inventory Control |
| Safety Socket Screw Corp. (VTL Automotive) | Assistance With Inventory Control Plan and DBSI/MRPII Implementation |
| Sagar Richards Ltd. | Feasibility Study on CAD/CAM and Linked Engineering Business Systems |
| Saunders Valve Company Ltd. (Crane Process Flow Technologies) | Assistance with the Finalization of the South Works Manufacturing Plan |
| Saunders Valve Company Ltd. (Crane Process Flow Technologies) | Implementation Assistance |
| SBM Wageneder | Elaboration of a New Concept for Plant Restructuring and Decreasing Overhead Cost |
| Schiess SMTCL | Strategic Investment Planning |
| Scot Industries Inc. | Concept Development of Manufacturing System for Steel Billets |
| Scot Industries Inc. | Improve Material Handling System and Develop Revised Layout |
| Scovill Inc. | Planning Project for Major Facilities Improvement Project |
| Seeg | Reduction of Production and Delivery Cycle |
| Shanghai Machine Tool Corp. | Develop Plans to Modernize Machine Tool Manufacturing |
| Siebe Environmental Controls (Invensys Building Systems Inc.) | Cell Technology Workshop |
| Simonds Saw & Steel (Simonds International Corp.) | Feasibility Study for Grinding Flat Ground Stock |
| SKF Industries, Inc. | Audit of Product Transfer and Plant Expansion Plan for Manufacture of Bearing Accessories |
| SKF Industries, Inc. | Inquiry Specifications for New Turning Equipment for Manufacturing Bearing Accessories |
| SKF Industries, Inc. | Detail Plant Layout for Bearing Accessories Manufacturing |
| SKF Ltd. | Adaptation of Plant Grevenbroich to Future Requirements |
| SMS Eumuco Inc. | Phase I: Assessment of Current Status And Framework For Actions |
| SMS Hasenclever (SMS Eumuco) | Konzept Mechanische Fertigung |
| SPX - GSE Techmotive | Inventory Management Program |
| SPX Valves & Controls | Assessment of Rationalization/Consolidation Effort at Sartell |
| Square D Company | Analyze Wiring Practices |
| Stenner of Tiverton Ltd. | Design of a Heavy Duty Sawmill |
| Stephens-Adamson | Develop Plan for Least-Unit-Cost Manufacturing of Conveyor Idler Rollers |
| Sullair Corporation | Plant Receiving Area Planning |
| Summit Machine Tool Mfg. Corp. | Technical Analysis of Several CNC Turning Machines |
| Superior Valve Company | Resource Planning for New Product |
| T.I. Chesterfield Ltd. | Production Expansion and Improvement Study |
| T.I. Chesterfield Ltd. | Machine Tool Investment Planning - Initial Survey |
| T.I. Chesterfield Ltd. | Machining Facilities - Professional Services of Ray Hoss |
| T.I. Chesterfield Ltd. | Tooling Development Program |
| T.I. Chesterfield Ltd. | Start-Up of New Boring Machine Stainless Steel Extrusion Department |
| T.I. Chesterfield Ltd. | Planning of Machining Facilities and Shop Reorganization for Central Machine Shop and Tool Room |
| T.I. Chesterfield Ltd. | Facilities Improvement Study of the Bemil Despatch Area |
| T.I. Chesterfield Ltd. | Production Improvements of Bemil Archdale Line |
| Taylor-Winfield Corp. | Plan for Upgrading and Expanding Production Capability of Machine Shop |
| Thomas Coupling (Rexnord Coupling Group) | Implementation Assistance for Cell-Oriented Coupling Manufacturing Systems |
| Thomas Coupling (Rexnord Coupling Group) | Assist in Improving Cell Output |
| Thomas Coupling (Rexnord Coupling Group) | Pilot Program to Optimize NC Equipment Productivity |
| Thomas Coupling (Rexnord Coupling Group) | Plan for Cost Reduction and Growth - Motor Couplings |
| Toshiba Machine Co. of America | CAD/CAM Consultation |
| Touche Ross Consulting/Intercontinental Mfg. Co. | Assist in Preparing the Proposals for Phase I: Conclusion |
| Travis & Arnold Plc | Selection of a Computer-Controlled Planer, Moulder Woodworking Machine |
| Travis & Arnold Plc | Implementation of New Timber Cutting Machinery |
| Travis & Arnold Plc | Material Handling/Automation Review |
| Tuke & Bell Ltd. | Analysis of the Design of an Archimedes Screw Pump |
| Unimation Ltd. (Stambli Ltd.) | Generic Systems Project - Phase I: Submission to DTI/BTG |
| Union Special Corporation | Focused Factory Planning |
| Union Special Corporation | Focus Factory Detailed Engineering |
| Union Special Corporation | Assistance with Inventory Reductions |
| Union Special Corporation | Interim Materials Management, Materials Director Recruiting, & MUSIC Systems Implementation Assist. |
| Union Special Corporation | Continued Assistance with Materials Management and MUSIC Program |
| Union Special Corporation | Education and Training: MRPII Class |
| Union Special Corporation | Critical Analysis of Missed Shipments |
| Union Special Corporation | Continued Assist. with the MUSIC Project - Implementation of Shop Floor Control Module of Cullinet |
| Union Special Corporation | Phases II and III: Implementation and Cullinet System Use |
| Union Special Corporation | Phase II: Implementation Planning and Assistance |
| Union Special Corporation | Phase III: Implementation Assistance and Ongoing Detailed Engineering |
| Union Special Corporation | Phase IV: Implementation, Management and Monitoring |
| Union Special Corporation | Continuation of Phase IV: Implementation, Management, and Monitoring |
| Union Special Corporation | Continued Assistance with MUSIC Program |
| Union Special Corporation | Continued Assistance with MUSIC Project |
| Union Special Corporation | Continued Assistance with the MUSIC Program |
| Union Special Corporation | Continued Assistance With 39500 Aftermarket Business Program |
| Union Special Corporation | Continued Assistance With MUSIC Project |
| Union Special Corporation | Continued MUSIC Assistance |
| Union Special Corporation | Continuation of MUSIC Project |
| Union Special Corporation | Front-End Processor Implementation Assistance |
| Union Special Corporation | Systems Assessment and Plan Development |
| Union Special Corporation | System Development |
| Union Special Corporation | Business Systems Implementation |
| Union Special Corporation | Assistance with Tracking and Measuring System for the 39500 Focused Business Program |
| Union Special Corporation | Assistance with the 39500 Aftermarket Business Program |
| Union Special Corporation | Small Group Facilitation |
| Union Special Corporation | Continued Small Group Coordination |
| Union Special Corporation | Transition Program for MUSIC |
| United Dominion Ind., TIF Instruments (SPX) | Business Systems Review of ATP |
| United Dominion Ind., TIF Instruments (SPX) | ATP Outsourcing Project and Singapore Facility Analysis |
| United Dominion Ind., TIF Instruments (SPX) | ATP Consolidation |
| Van Moppes IDP Ltd. | Solution Guidelines to Automate EDM Process for ‘Compax’ Grinding Wheel Dresser Manufacture |
| Volkmann GmbH & Co. | CAD/CAM Feasibility |
| Volkmann GmbH & Co. | Parts Spectrum Analysis and Material Flow Concept |
| Wadkin Bursgreen | Manufacturing Improvement Strategy |
| Wadkin PLC | Assist. With the Preparation of a Financially Justified Manufacturing Plan Incorporating FMS |
| Waldrich Coburg GmbH | Development of a Concept for an Efficient Factory - Step 1: Critical Analysis |
| Waldrich Coburg GmbH | Development of a Concept for an Efficient Factory - Step 3: Factory Layout and Evaluation |
| Waldrich-Siegen | New Factory Planning - Burbach |
| Waldrich-Siegen Ingersoll Burbach | CAD/CAM Implementation Strategy |
| Wallace & Tiernan | Phase I: Critical Analysis and Master Plan Concept |
| Walmsleys Bury Ltd. | Production Improvement Study |
| Warren Tool Corp. (Wilton Tool) | Critical Analysis |
| Warren Tool Corp. (Wilton Tool) | Leading Advisory Team In Business Turn-Around |
| Wean-McKay of Canada Ltd. | Machine Shop Upgrade Study |
| Wean-United (Danieli Wean-United) | Evaluation of Four Manufacturing Facilities To Improve Productivity |
| Werner & Pfleiderer KG (Coperion Werner & Pfeiderer KG) | Critical Analysis of Overall Company (2 Divisions: Bakery Equipment/Plastic Extrusion Machines) |
| Werner & Pfleiderer KG (Coperion Werner & Pfeiderer KG) | Concept for a Master Schedule System |
| Wheway Walton (CM) Ltd. | Study: Redesign of Shackle and Chain Connectors for Chain Conveyor Product |
| William Tatham Ltd. | DTI/Product Cost Analysis |
| Wilton Corporation Tool Group | FMS Project Management |
| Woodings Verona Tool Works Inc. | Preliminary Critical Analysis |
| Woodings Verona Tool Works Inc. | Implementation of Recommendations |
| Wright Machine Tools Ltd. | Study: Evaluation of Quality Function to Comply with BS5750 - Part 1 |
| Youngman, W.C. Ltd. (SGB/Harsco) | Evaluation of Quality Function to Comply With BS5750 |
| Zanini S.A. Equipamentos Pesados (Renk Zanini) | Productivity Improvement and Facilities Utilization for Medium and Heavy Machine Shops |