| Rail & Railway Equipment |
| Company | Project Description |
| Brenco Incorporated (Amsted) | Diagnosis and Recommendations For Cost Reductions |
| British Rail Engineering Ltd. (Bombardier) | Preparation of 5-Year Mfg. Plan Incorporating FMS and Short-Term Improvement Opportunities |
| British Rail Engineering Ltd. (Bombardier) | Tender Specification for Variable Gauge Bogies |
| British Rail Engineering Ltd. (Bombardier) | Rationalization of Power Unit Repairs |
| British Rail Engineering Ltd. (Bombardier) | Assistance With Creating an Integrated Bogie Manufacturing Facility |
| British Rail Engineering Ltd. (Bombardier) | Implementation of the Integrated Bogie Facility |
| British Rail Engineering Ltd. (Bombardier) | Business System for Integrated Bogie Manufacturing Facility |
| British Rail Engineering Ltd. (Bombardier) | Assistance with Wage Payment Scheme |
| British Rail Engineering Ltd. (Bombardier) | Improving Productivity and Financial Performance in the Machine Shops |
| Clyde Iron Works | Facility Improvement - Machine Shop and Mechanical Assembly |
| Clyde Iron Works | Implementation of Facilities Improvement Project |
| Clyde Iron Works | Phase II: Clyde Implementation Project (PN 59380) |
| Constructions Ferrovaires | Investment Plan Review |
| Constructions Ferrovaires | Product and Plant Rationalization Planning Assistance |
| CSX Transportation Inc. | Streamlining the Side Line |
| Electro-Motive Diesel | Operations Improvement Support |
| Electro-Motive Division | Cutting Tool Study |
| Electro-Motive Division | System Study of Machining Diesel Engine Cases/Project Maewil |
| Electro-Motive Division | System Study on the Cylinder Liner Line/Project Mae West |
| Electro-Motive Division | Project Kanam Facilities Planning for Piston Pin Carrier Manufacturing System |
| Electro-Motive Division | Technical Assistance With Tooling |
| English Electric Diesels | System Study to Develop Advanced Manufacturing System for Connecting Rods |
| Fairmont Tamper (Harsco Track Technologies) | Plant Consolidation |
| Henry Boot Railway Engrg. Ltd. | Evaluation of Quality Function to Comply with BS5750 - Part 1 |
| Henry Boot Railway Engrg. Ltd. | Quality Assurance BS5750 - Part 2 |
| MAN-GHH GmbH | Review of Manufacturing System for Railroad Carwheel Sets |
| MAN-GHH GmbH | Feasibility Study for a Prod. Planning and Control System for the Machinery Division (3 Works) |
| MAN-GHH GmbH | |
| MLW Industries | Productivity Improvement of Diesel Engine Manufacture |
| New York Air Brake Company | Conceptual Productivity & Cost Improvement for Railroad Products & Stratopower Pump Manufacture |
| OLEO Pneumatics Ltd. (Acquired by Wagon plc) | Design of Lift Buffers Using Alternative Materials |
| OLEO Pneumatics Ltd. (Acquired by Wagon plc) | Design of a Dynamic Impact Static and Cyclic Rig |
| Pullman Company, The | Phase I: Feasibility/Concept Design/Implementation Planning |
| Pullman Standard | Phase II: Develop Plan to Upgrade the Forge Shop |
| Pullman Standard | Comprehensive Evaluation of the Butler Forge Shop |
| Pullman Standard | Forge Shop Comparative Analysis/Gross Profit: Operating Cost at Varied Levels of Production |
| Pullman Standard | Manufacturing Plan for New Design Coal Gondola Freight Car |
| Standard Steel | Machining Cost Reduction and Facility Improvement |
| Union Switch & Signal | Processing of Parts for NC Machining |