| Aerospace & Defense |
| Company | Project Description |
| Aerospatiale (EADS) | Space Program Management (Ariane 5) Launcher |
| Aerospatiale (EADS) | Role of the Industrial Architect/Space Program (Ariane 5) |
| Agence Spatiale Europeenne (ESA) | Safety and Reliability Analysis of Ariane 5 Concept |
| AiResearch Mfg. Co. of Arizona (Acquired by Honeywell) | New Facility Planning for Axial Compressors |
| Alfa Romeo Avio Spa (Acquired by Fiat Avio) | Development Plan for Support of Activity for Improvement Potentials Phase I: Identification |
| Alfa Romeo Avio Spa (Acquired by Fiat Avio) | Implementation of Improved New Product Management |
| AlliedSignal Inc. Aerospace (Acquired by Honeywell) | Phase I: Strategic Direction - Phase II: Reconfigure Facility |
| AlliedSignal Inc. Aerospace (Acquired by Honeywell) | Increasing Machine Utilization |
| Alvis Ltd. (Acquired by BAE Land Systems) | Proposal for Financially Justified Advanced Manufacturing Strategy for New Vehicle Family |
| Alvis Ltd. (Acquired by BAE Land Systems) | Manufacturing and Facilities Strategy for Fighting Vehicle transmissions |
| Alvis Ltd. (Acquired by BAE Land Systems) | Should-Cost Exercise for MCV80 |
| Alvis Ltd. (Acquired by BAE Land Systems) | Purchasing/Resource Assistance |
| AM General Corp. | Piece Part Processing - Machining and Assembly for New Military Vehicle |
| AP Precision Hydraulics Ltd. | Manufacturing Facilities for Aircraft Landing Gear |
| Avco Lycoming (Acquired by Textron) | Rearrangement of Recuperator Line |
| Avco Lycoming (Acquired by Textron) | Operations Resequencing |
| Avco Lycoming (Acquired by Textron) | Modify Present FMS and Support Systems to Produce 100 Engines/Month - AGT 1500 Jet |
| Babcock Handel | EDP System Concept and Implementation |
| Babcock Power Ltd. | Production Audit and Methods Improvement |
| Barry Controls Aerospace | Capacity Planning |
| Beaufort Engineering Ltd. | Efficiency Evaluation of NC Turning |
| Bell Helicopter | APT Videotape training Course |
| BMY (BAE Land Systems) | Develop Conceptual Plan for Hull Manufacturing and M9-ACE Assembly |
| BMY (BAE Land Systems) | Weld Critique and Cell Development for Steel Focus Foundry |
| BMY (BAE Land Systems) | Consolidation of Aluminum Plate and Sheet Preparation |
| BMY (BAE Land Systems) | Continued Technical Assistance With Implementation of Aluminum Focus Factory |
| BMY (BAE Land Systems) | Continuing Implementation Assistance for the Aluminum Focus Factory |
| BMY (BAE Land Systems) | Definition of New Aluminum Hull Machining Systems |
| BMY (BAE Land Systems) | Continued Assistance With the Aluminum Hull Machining System |
| BMY (BAE Land Systems) | Improving Aluminum Component Machining Capabilities |
| BMY (BAE Land Systems) | Continued Modernization Implementation Assistance |
| BMY (BAE Land Systems) | Development of Operations Plan |
| BMY (BAE Land Systems) | Maximizing the Benefits From the Suspension Components Area |
| BMY (BAE Land Systems) | Phase III: Planning Assistance |
| BMY (BAE Land Systems) | Aluminum Component Consolidation - “Make It Happen” 1990 Plant Consolidation |
| BMY (BAE Land Systems) | Implementation Assistance (Continuation of PN 63593) |
| BMY (BAE Land Systems) | Aluminum Sub-Weld Improvement Opportunities/Cost Model Development |
| BMY (BAE Land Systems) | Presentation Development |
| Boeing Canada Technology Ltd. | Upgrade of the Composites Fabrication Area |
| Boeing Canada Technology Ltd. | Performance Improvement and Master Plan |
| Boeing Canada Technology Ltd. | Redesign of the HR Function and Leadership Team Building |
| Boeing Commercial Airplane Co. | Factory of the Future Concept for Fuselage Assembly |
| Boeing Commercial Airplane Group | Review of Proposed Rotomold System |
| Boeing Commercial Airplane Group | Critique Rotomold Plan |
| Boeing Commercial Airplane Group | Pull System Review |
| Boeing Commercial Airplane Group | Leadership Development Program |
| Boeing Commercial Airplane Group | Support For Leadership Team transition Program |
| Boeing Commercial Airplane Group | Support For Leadership Team transition Program—REPLACES 67469 |
| Boeing Commercial Airplane Group | Benchmark Head Count Indirect/Direct Ratio |
| Boeing Commerical Airplane Group | Develop Focused Manufacturing Unit for Large Number of Small Composite Parts |
| Boeing Commerical Airplane Group | Implementation Assistance |
| Boeing Military Airplane Co. | Develop a Proposal for an Implementable Strategic Manufacturing Plan |
| Boeing of Portland | Continued Assistance with Aisle Stand Assembly Program |
| Boeing of Portland | Leadership Team Workshop |
| Boeing of Portland | Assistance with Performance Development Program for Manufacture of Aisle Stands |
| Boeing of Portland | Buffer/Regulator Implementation Initiation |
| Boeing-McDonnell Military Aircraft | Cell Design Program |
| British Aerospace Ltd. (BAE Systems) | Final Assembly Strategy |
| British Aerospace Ltd. (BAE Systems) | Keel and Boxing Cell Implementation |
| British Aerospace Ltd. (BAE Systems) | Current Inventory Analysis |
| British Aerospace Ltd. (BAE Systems) | Launching 146 Initiatives |
| British Aerospace Ltd. (BAE Systems) | 146 Inventory Reduction |
| British Aerospace Ltd. (BAE Systems) | Inventory Reduction |
| British Aerospace Ltd. (BAE Systems) | Production Engineering Logistics |
| British Aerospace Ltd. (BAE Systems) | Manufacturing Strategy |
| British Aerospace Ltd. (BAE Systems) | Material Handling Aspects of Stringer Manufacturing |
| British Aerospace Ltd. (BAE Systems) | Materials Management Strategy Development |
| British Aerospace Ltd. (BAE Systems) | Upgrading of Stringer Manufacturing Facilities |
| British Aerospace Ltd. (BAE Systems) | Consolidation Study |
| British Aerospace Ltd. (BAE Systems) | Work Plan for Developing Site Strategy |
| British Aerospace Ltd. (BAE Systems) | Review of Panel and Stringer Work Flow and Layout |
| British Aerospace Ltd. (BAE Systems) | Assistance with 146 Business Review |
| British Aerospace Ltd. (BAE Systems) | Airline Division Information Technology Action Plan |
| British Aerospace Ltd. (BAE Systems) | Engineering Accounting Procedures and Costing Methods |
| British Aerospace Ltd. (BAE Systems) | Team Leader/Engineer Development Program |
| British Aerospace Ltd. (BAE Systems) | Divisional Rationalization Program |
| British Aerospace Ltd. (BAE Systems) | Achieving Competitiveness in Airbus Details Manufacture |
| British Aerospace Ltd. (BAE Systems) | Airbus Implementation Phase |
| British Aerospace Ltd. (BAE Systems) | Airbus Project - Implementation Phase |
| British Aerospace Ltd. (BAE Systems) | Preparation of Strategy Action Plan |
| British Aerospace Ltd. (BAE Systems) | Site Strategy |
| British Aerospace Ltd. (BAE Systems) | Airlines Division Strategic Direction |
| British Aerospace Ltd. (BAE Systems) | Vision for the Integrated Business Unit for “Details” Supply |
| British Aerospace Ltd. (BAE Systems) | Supply Business Strategy |
| British Aerospace Ltd. (BAE Systems) | Business Supply Strategy |
| British Aerospace Ltd. (BAE Systems) | Supply Business Implementation |
| British Aerospace Ltd. (BAE Systems) | Assistance with Improvements in Systems and Procedures for Supplier Payment |
| British Aerospace Ltd. (BAE Systems) | Specialist Assistance with CFC Project |
| British Aerospace Ltd. (BAE Systems) | Project Jaguar |
| Cessna Aircraft Co. | Engineering and Administrative Space Planning for Consolidation of Two Divisions |
| Cessna Aircraft Co. | Improve Utilization of NC Equipment |
| Cessna Aircraft Co. | Phases I and II: Long-Range Manufacturing Planning |
| Cessna Aircraft Co. | Develop Long-Range Manufacturing Plan (Continuation of P.N. 63224) |
| Cessna Aircraft Co. | Composites and Plastics Critical Review |
| Cessna Aircraft Co. | Evaluate Fabrication Loads Based Upon Forecast |
| Cessna Aircraft Co. | Develop Near-Term Productivity Improvements |
| Cessna Aircraft Co. | Help with Proposal/Subcontract Quotation Package Assistance |
| Cherry Textron Incorporated (Textron Fastening Systems) | Business Growth Review |
| Chromalloy Compressor Tech. (Sequa) | Manufacturability Opinion -New Turbocharger |
| Controlex-Eanco | Critique Operating Costs |
| Controlex-Eanco | Assistance in Resolving Product Back Orders |
| Controlex-Eanco | Review Data Base Enhancement Progress |
| Controlex-Eanco | Manage Client’s Team in Sorting Out Data Base |
| Crompton Parkinson Ltd. (Cooper Lighting) | Redesign of the Manufacturing Business |
| Crompton Parkinson Ltd. (Cooper Lighting) | Production of Steel Stator Frames |
| Crompton Parkinson Ltd. (Cooper Lighting) | Implementation of the Redesign of the Manufacturing Business |
| CSEE Defense | Rationalization of Production/Simplification of Information Systems in Defense Industry |
| Dassault Aviation | Assistance With Development Phase Implementation of Thermal Protection System for Hermes |
| Dowty Boulton Paul Ltd. | Assistance With Engineering Systems Specification/Selection of First Equipment Purchase |
| Dowty Boulton Paul Ltd. | Assistance With Information Systems Strategy Development |
| Dowty Electronics (Ultra Electronics) | Evaluation of Quality Function to Comply with BS5750 |
| Dowty Group Plc (Smiths Aerospace) | Short Critical Review of the Use of Manufacturing Resources in the Aerospace/Defense Division |
| Dowty Rotol Ltd. | Overview of Investment in Isle of Man Engineering |
| Dowty Rotol Ltd. | Assistance with Site Strategy Product Support |
| EPS Ltd. | CAD/CAM Feasibility Study |
| EPS Ltd. | Project Planning and Implementation of CAD |
| FAG Cuscinetti SpA (Umbra Cuscinetti) | Characterization of Industrial Operations and New Product Potential |
| FAG Cuscinetti SpA (Umbra Cuscinetti) | Phase II: Characterization of Industrial Operations and New Product Potential |
| FAG Kugelfischer, Georg Schafer (Umbra Cuscinetti) | Development of EDP Security Concept for Foreign Subsidiaries |
| FAG Kugelfischer, Georg Schafer (Umbra Cuscinetti) | Critical Analysis of Concept for EDP Strategy |
| FAG Kugelfischer, Georg Schafer (Umbra Cuscinetti) | Critical Analysis and Manufacturing and Systems Strategy for Aerospace Bearings |
| FAG Kugelfischer, Georg Schafer (Umbra Cuscinetti) | Critical Analysis of All Manufacturing Operations - Goal: Size Assembly, Warehousing and Shipping |
| FAG Kugelfischer, Georg Schafer (Umbra Cuscinetti) | Market Analysis |
| FAG Kugelfischer, Georg Schafer (Umbra Cuscinetti) | System Design for Foreign Subsidiaries |
| Fairchild-Weston Systems | Develop Material Handling System for New Plant |
| Fairey Holdings Group | Development of a Fabrication Capability Profile |
| Fairey Holdings Group | Mexi Float |
| Finmeccanica | Integration Strategies In Civil and Military Aeroplanes and Helicopters |
| FLIR Systems | Evolving Lean Best Practices & Operations Move Plan |
| FLIR Systems | Performance Improvement Program (LDMS & Scheduling) |
| FLIR Systems | Phase II: Performance Improvements in Cooler Lab |
| Fokker BV | Manufacturing Cost Reduction |
| Fokker BV | Development of Manufacturing Plan for Ypenberg Bonded and Composite Operations |
| Fokker BV | Cost Reduction and Systems Development |
| Fokker BV | Overview Project |
| Fokker BV | Piece Parts Production - Drechtsteden |
| Fokker BV | Supply Management |
| Fokker BV | Phase II: Cash on Delivery |
| GE Aircraft Engines | Continued New Plant Development Detail Planning |
| GE Aircraft Engines | Continued New Plant Development |
| GE Aircraft Engines | Turbine Blade Plant Start-Up |
| General Dynamics Corp. | Planning and Integration Assistance - Advanced Machining System |
| General Dynamics Corp. | Machine Shop Improvement Review and Recommendation Development |
| General Dynamics Corp. | Preliminary Manufacturing Analysis Project for Viper Production |
| General Dynamics Corp. | Productivity Review of Stinger Manufacturing System |
| General Dynamics Corp. | Develop Preliminary Facility Plan for Plate Handling and Processing - Submarines |
| General Dynamics Corp. | Subcontract to Arthur Andersen for Phase I of Ind. Productivity Improvement Program/IMIP |
| General Dynamics Corp. | Prepare Technical Proposals for GDLS to Submit to TACOM |
| General Dynamics Corp. | Parametric Rationale Support of Selected Projects for Corporate Approval |
| Hamilton Standard (Hamilton Sundstrand) | Process Evaluation |
| Intertechnique (Zodiac) | Assistance with DTM Project Management: Military Equipment |
| Intertechnique (Zodiac) | Assistance with DTM Project Management for Manufacture of Military Equipment |
| Israel Aircraft Industries Ltd. (IAI) | Critical Analysis of Beer Sheva Operations |
| Israel Aircraft Industries Ltd. (IAI) | Operational Improvements |
| Israel Aircraft Industries Ltd. (IAI) | Support to Business Growth |
| Israel Aircraft Industries Ltd. (IAI) | F15 Action Plan |
| King Fifth Wheel Company (Smith Aerospace Components) | Inventory Cost Model |
| Kollsman Inc. | Critical Analysis of Operations |
| Kongsberg Vaapenfabrik (Kongsberg) | Critical Analysis of Jet Engine Component Manufacturing Facilities and Methods |
| Kongsberg Vaapenfabrik (Kongsberg) | Support for Short-Term Performance Improvements |
| Krupp Atlas Elektronik (Atlas Elektronik) | Audit of Approach to Enter CAD/CAM Market as a System Supplier |
| Lockheed Martin SBF | Analysis of Mfg. Capability and Capacity Expansion at SBF |
| Lockheed Missiles & Space Co., Inc. (Lockheed Martin Missiles & Fire Control) | Critique Present Plans to Upgrade and Improve Multi-Layer PCB Fabrication Operation |
| Loral / Ford Aerospace (Lockheed Martin) | Critique of Long-Range Facility Plan |
| Loral / Ford Aerospace (Lockheed Martin) | Electronics Fabrication Plant Operations Analysis and Improvement Plan |
| Loral / Ford Aerospace (Lockheed Martin) | Phase II: Electronic Fabrication Plant Improvement Planning and Implementation |
| Loral / Ford Aerospace (Lockheed Martin) | F/A-18 Aft Section Assembly Operations Improvement Plan |
| Loral Aerospace Corporation (Lockheed Martin) | Master Plan for Project Head Start (Systems Engineering) |
| Loral Aerospace Corporation (Lockheed Martin) | Manufacturing Consolidation and Space Utilization Plan - Building Four Missile Assembly |
| Lucas Aerospace Ltd. | Manufacturing Methods Analysis |
| Lucas Aerospace Ltd. | Strategic Analysis of Engine Fabrication Business |
| Lucas Aerospace Ltd. | Igniter Cost Reduction |
| Lucas Aerospace Ltd. | Site and Layout Strategy |
| Lucas Aerospace Ltd. | Develop Site Strategy |
| Lucas Aerospace Ltd. | Feasibility Study for Side Options |
| Lucas Aerospace Ltd. | Electro-Luminescence Assess Cost Reduction Potential |
| Lucas Aerospace Ltd. | Cost Structure Master Plan Including Reward Scheme |
| Lucas Aerospace Power Equip. Corp. | Critique Plans for .Installation of Electronic Manufacturing Cell in Maple Heights |
| Lucas Western (triumph Gear Systems) | Phase II: Detail Facility Layout Plan |
| Martin Marietta Aerospace (Lockheed Martin) | Composite Facility Expansion Plan Critique |
| Martin Marietta Aerospace (Lockheed Martin) | Developing Machining Concept for Liquid Hydrogen Tank Barrels |
| Martin Marietta Aerospace (Lockheed Martin) | Copperhead Missile Machining Problem Overview |
| Martin Marietta Aerospace (Lockheed Martin) | Develop “Japanese” Flow-Through Manufacturing System to Produce Light Armored Vehicles (LAV) |
| Martin Marietta Aerospace (Lockheed Martin) | Construct 1/4 Scale Model of Vertical Launching System |
| Martin Marietta Aerospace (Lockheed Martin) | Production Planning Audit for Space Shuttle Fuel Tanks |
| Martin Marietta Aerospace (Lockheed Martin) | Manufacturing, Planning & Pre-Implementation Assistance for U.S. Navy Vertical Launch System |
| Martin Marietta Aerospace (Lockheed Martin) | Technical Editing of VLS Production Plan |
| McDonnell Aircraft Co. (Boeing) | Phase I: Planning for Material Handling System for the New Composites Shop |
| McDonnell Douglas Aircraft Co. (Boeing) | Cellularization of Final Assembly Operations (Proposal Submitted By/Contact: Lockwood Greene) |
| McDonnell Douglas Aircraft Co. (Boeing) | Phase II—Preliminary Design |
| McDonnell Douglas Aircraft Co. (Boeing) | Operational Facilities Improvement |
| McDonnell-Douglas Astronautics (Boeing) | Subcontract to Brown & Root - Preliminary Planning Assistance for the Advanced Launch System |
| McDonnell-Douglas Astronautics (Boeing) | Joint Venture with United Research Comany Inc. - Analysis and Proposal Preparation |
| McKechnie Plc | Critique of Paint Plant Proposed at Derwent Plastics |
| Messerschmitt-Bolkow-Blohm GmbH (EADS Germany) | Future Manufacturing Technology Improvements for Composite Facility |
| Milturn Corp. | Critical Analysis of Jet Engine Fittings Manufacture |
| Nat’l. Aeronautics & Space Admin. | Site Selection for Assembly of Space Shuttle Launch External Fuel Tank |
| NWL Control Systems (Abex NWL Division) | Establishing Continuous Lowest-Cost Production of AAWS-M Control System |
| Officine Galileo | Implementation of Action Plan for MADIS Program |
| Officine Galileo | DSMS Programs Risks Evaluation and Action Plan |
| Officine Galileo | Implementation for MAIDS and TURMS Program |
| Officine Galileo | DSMS Programs Risk Evaluation and Action Plan - Optical Equipment |
| Officine Galileo | Optronic Fire Control System Program Review |
| Officine Galileo | TURMS Program Review |
| Officine Galileo | TURMS Program Planning Preparation |
| Officine Galileo (Galileo Avionica / Finmeccania) | Continuation of ‘Produzione 90’ & Development of Applications in HP Environment - Optical Equipment |
| Plessey Displays Ltd. (BAE Systems) | Integrated Manufacturing |
| Plessey Displays Ltd. (BAE Systems) | Integrated Manufacturing Project |
| Pratt & Whitney Aircraft | Technical and Economics Review of Client’s Plans for Automation |
| Pratt & Whitney Aircraft | Plant Automation Feasibility Studies |
| Pratt & Whitney Aircraft | Critique Present Plans for Turbine Blade Grinding |
| Pratt & Whitney Aircraft | Evaluate Alternative Machining Systems for Airfoils |
| Pratt & Whitney Aircraft | Continued Development of Airfoil Machining Concepts |
| Pratt & Whitney Aircraft | Develop Strategic Manufacturing and Facilities Plan for East Hartford |
| Pratt & Whitney Aircraft | Automated Material Handling Concepts and Product Flow Concepts for Gear Manufacturing |
| Pratt & Whitney Aircraft | Development of an Implementable Manufacturing Plan |
| Pratt & Whitney Aircraft | Conceptual Design of Case and Duct Machining Systems |
| Pratt & Whitney Aircraft | Conceptual Design of Case and Duct Weldments/Fabrications |
| Pratt & Whitney Aircraft of Canada | Phase I: Concept Review of Strategic Manufacturing Plan |
| Pratt & Whitney Aircraft of Canada | Detail Engineering Phase of Warehouse Optimization Program |
| Pratt & Whitney Aircraft of Canada | Warehouse Optimization Program |
| Raytheon Company | Evaluation of Strategic Planning |
| Rediffusion Simulation Ltd. (Thales training & Simulation Ltd.) | Development of Improved Procedures for Engineering Change |
| Republic Aviation (Fairchild-Hiller Corp.) | Cost Improvement Study - Aircraft Parts |
| Republic Aviation (Fairchild-Hiller Corp.) | Productivity Improvement of Aircraft Parts Manufacture |
| Rheinmetall GmbH | Management Information System |
| Rheinmetall GmbH | Parts Factory of the Future for 105/120 MM Ammunition - Phase I: Pre-Analysis |
| Rheinmetall GmbH | Simulation System for Strategic Company Cost Planning |
| Rinaldo Piaggio | Industrial Development Plan - 1990 Actions: Aircraft Engines |
| Rinaldo Piaggio | Industrial Development Plan to Manufacture Aircraft Engines |
| Rinaldo Piaggio | Industrial Strategy |
| Rinaldo Piaggio | Industrial Strategy for Aircraft and Aircraft Engine Manufacture |
| Rohr Incorporated (Acquired by Aerostructures Group/Goodrich Corp.) | Cellularization Program Assistance |
| Rohr Incorporated (Acquired by Aerostructures Group/Goodrich Corp.) | Gap Analysis: Describing Strategic & Business Performance Issues Involved in the Bonding Business |
| Rohr Incorporated (Acquired by Aerostructures Group/Goodrich Corp.) | Counsel To Business Improvement Program |
| Rolls Royce plc | Establishment of an Automated System for Turbine Blade Machining |
| Rolls Royce plc | Establishment of an Automated System for Turbine Blade Manufacture |
| Rolls Royce plc | Energy Conservation Feasibility Study |
| Rolls Royce plc | Manufacturing Strategy - Corporate |
| Rolls Royce plc | Develop Advanced Manufacturing System for Compressor Wheels & Turbine Discs for RB211 Engine |
| Rolls Royce plc | Blade, Wheel and Disc Manufacturing Cost Reduction |
| Rolls Royce plc | Continuation of Specialist Engineering Services |
| Rolls Royce plc | Evaluate Manufacturing Capability and Advise Potential Buyer of Company |
| SARMA (SKF Aerospace) | JIT Implementation for New Plant for Flight Command for Aircraft |
| SARMA (SKF Aerospace) | Just-In-Time Implementation |
| SEP (Snecma) | Co-Contractors and Cost Management Action Plan Implementation |
| SEP (Snecma) | Co-Contractors and Cost Control Mgmt. Action Plan Implem. for Mfg. of Engines for Space Launchers |
| SEP (Snecma) | Configuration Management Consolidation for Ariane 5 |
| SEP (Snecma) | Configuration Management Consolidation for Engines for Space Launchers |
| Short Brothers Ltd. (Acquired by Bombardier Aerospace) | Overview of Manufacturing Technology of Future Stand-Off Weapon System Project |
| Short Brothers Ltd. (Acquired by Bombardier Aerospace) | Engineering and Implementation of a Facility to Produce the Starstreak Missile |
| Short Brothers Ltd. (Acquired by Bombardier Aerospace) | Assistance with Preparation of Tenders |
| Sikorsky Aircraft | Machine Shop Improvement Project |
| Sikorsky Aircraft | Assist In Implementation of Shop Improvement Project |
| SNECMA (A SAFRAN Group) | Co-Contractors and Cost Control Management |
| Steyr-Daimler-Puch AG | CAD/CAM Detail Planning and Realization |
| Steyr-Daimler-Puch AG | CAD/CAM Detail Planning and Implementation |
| Steyr-Daimler-Puch AG | CAD/DAM Detail Planning and Implementation |
| Steyr-Daimler-Puch AG | Flexible Factory for Engine and transmission Plant |
| Steyr-Daimler-Puch AG | Preparation of Planning Schedule for a New transmission and Axle Factory |
| Steyr-Daimler-Puch AG | Detail Planning and Implementation Support for transmission and Axle Factory |
| Steyr-Daimler-Puch AG | Feasibility Study of a transmission Plant |
| Steyr-Daimler-Puch AG | Development of a Companywide Logistics Concept |
| Steyr-Daimler-Puch AG | Position Paper truck Production Feasibility Study for the Business |
| Steyr-Daimler-Puch AG | New Concept for the Manufacturing of Engine Parts |
| Steyr-Daimler-Puch AG | Develop Production Concept for the M1 |
| Steyr-Daimler-Puch AG | New Concept for Firearms Factory |
| Steyr-Daimler-Puch AG | M1 Engine Market Review and Comparison Study |
| Steyr-Daimler-Puch AG | Reorganization of the Vienna Plant |
| Steyr-Daimler-Puch AG | Reorganization of Vienna Plant |
| Steyr-Daimler-Puch AG | Foundry and Forge Rationalization |
| Steyr-Daimler-Puch AG | Reorganization of Tool Manufacturing |
| Steyr-Daimler-Puch AG | Preparation of Proposal for Restructuring of All Mechanical and Component Assembly Shops |
| Steyr-Daimler-Puch AG | CAD/CAM 87 |
| Stork-Werkspoor Diesel BV (Stork Special Products) | Injection Moulding Machine Facility Planning - Assembly Shop Improvement |
| Stork-Werkspoor Diesel BV (Stork Special Products) | Planning Assistance for Upgrading and Modernizing the Machining and Fabrication Facilities |
| Stork-Werkspoor Diesel BV (Stork Special Products) | Services of Daventry Service Engineers |
| Sundstrand Aerospace (Hamilton Sundstrand; a UTC Company) | Facility Planning and World-Class Manufacturing Design and Implementation Services |
| Sundstrand Aerospace (Hamilton Sundstrand; a UTC Company) | Restructuring and Layout of Overhaul Operations |
| Sundstrand Aviation (Hamilton Sundstrand; a UTC Company) | Evaluate Equipment Options, Including Cost Estimates for a New Pump Manufacturing Operation |
| Sundstrand Aviation (Hamilton Sundstrand; a UTC Company) | Processing of Two Aerospace Components |
| Sundstrand Aviation (Hamilton Sundstrand; a UTC Company) | Assist in Implementation of New Manufacturing Concepts |
| Sundstrand Corporation (Hamilton Sundstrand; a UTC Company) | One-Day CAD/CAM Consultation |
| Sundstrand Corporation (Hamilton Sundstrand; a UTC Company) | New Facility Plan for Manufacture and Assembly of Air Conditioning Compressors |
| Teledyne Continental Motors | Assist in Preparing Critical Path Matrix for Second-Generation Tank Engine Proposal |
| Teledyne Continental Motors | Developing ‘Should-Cost’ for Hydraulic Stabilizer for Battle Tanks |
| Teledyne Continental Motors | Assist in Preparing Proposal to TACOM for M9 Armored Combat Earthmover (ACE) |
| Teledyne Continental Motors | New Main Battle Tank Proposal |
| Textron Inc. | Develop Master Plan and Implementation Program for World Class Manufacturing |
| Textron Inc. | 15-7 Stem Problem |
| Thorn EMI Electronics Ltd. (Acquired by Thales plc) | Cost Reduction Feasibility Study |
| Thorn EMI Electronics Ltd. (Acquired by Thales plc) | New Product Introduction - Critique |
| Timken Aerospace & Super Precision | Pre-Assessment: Manufacturing Strategy Development |
| Timken Aerospace & Super Precision | Manufacturing Strategy Development |
| United Defense (BAE Land Systems) | Plant Design Review & Recommendations |
| Vickers Plc (Rolls Royce) | Sheet Metal FMS Modifications to a Detailed Planning of Original Concept |
| Vickers Plc (Rolls Royce) | Preparation of a Financially Justified Manufacturing and Facilities Strategy |
| Vickers Plc (Rolls Royce) | Assistance With the Preparation of a Board Submission |
| Vickers Systems Ltd. | Development of Integrated Manufacturing Facility |
| Wellworthy Ltd. | Implementation of Process Line Machining |
| Wellworthy Ltd. | Appraisal and Performance Improvement Study of Piston Link Line |
| Wellworthy Ltd. | Performance Improvement Study of Piston Link Line and Supporting Services |
| Wellworthy Ltd. | Phase II: Link Line Performance Improvement Study |
| Western Gear Corp. (Acquired by triumph Gear Systems) | Facility Plan for Machining Bomb Ejector Units |
| Western Gear Corp. (Acquired by triumph Gear Systems) | Phase II: Facility Planning, Development of Detailed Facility Layout |
| Western Gear Corp. (Acquired by triumph Gear Systems) | Block Layout for Gear Box Manufacture |
| Western Gear Corp. (Acquired by triumph Gear Systems) | Phase I: Facility Improvement - Manufacturing Operations Critique |
| Western Gear Corp. (Acquired by triumph Gear Systems) | Phase II: Detail Planning Activities |
| Wilcox Electric, Inc. | Assist With Fabrication Shop Improvements |