Implementation Execution at a Coal Mine

Case Studies

Implementation Execution at a Coal Mine

A Long Wall mining operation in North America struggled with development due to the underperformance of its Continuous Miner. In the end, the Continuous Miner’s movement grew from 45 feet to 70 feet, plus other projects identified helped to further improvements and sustainability.

Activities in this case study include:

  • Root Cause Identification
  • Project Charters
  • Six Sigma Design of Experiments

Note: Sign-up to download this case study and also get unlimited access to our entire library of case studies!

Sign-up and get instant access!
Performance ExcellenceOptimized. Implemented.
Implementation Engineers®, Performance Analytix®, enCompass®, and Beyond Consulting® are registered trademarks of Implementation Engineers,
LLC in the United States (Reg. Nos. 4,532,275, 4,654,456, 4,643,370, 5,644,506)