Improvements boost dough, cut costs for bakery

Improvements boost dough, cut costs for bakery

Case Studies

Improvements boost dough, cut costs for bakery

Increasing costs and a languishing product line forced a well-recognized, $10-billion-dollar provider of consumer food brands to seek improvements. The main business objective was a cost reduction of more than $5 million to be achieved in less than five months. With more than 500 active SKUs, 14 production lines, and a cold storage warehouse exceeding capacity, the challenge was significant.

Activities in this case study include:

  • Root Cause Analysis
  • Continuous Improvement
  • Training

Sign-up to read this case study!

Sign-up and get instant access!

 

Performance ExcellenceOptimized. Implemented.

Subscribe to Newsletter

Want to stay current with Implementation Engineers?
Enter your info below to receive our monthly newsletter.

Implementation Engineers®, Performance Analytix®, enCompass®, and Beyond Consulting® are registered trademarks of Implementation Engineers,
LLC in the United States (Reg. Nos. 4,532,275, 4,654,456, 4,643,370, 5,644,506)