Increasing Throughput in Furnace Operations

Increasing Throughput in Furnace Operations

Case Studies

Increasing Throughput in Furnace Operations

The largest producer of iron ore pellets in North America needed to increase its furnace throughput from 235 tons per hour to 250 tons per hour. The increased throughput was required to meet ongoing strong market demand. Training, quality, and optimum process settings improved the throughput and created an estimated annualized financial benefit of $3.9 million.

Activities in this case study include:

  • Process maps
  • Analysis of Current and Historical Data
  • Metrics

Note: Sign-up to download this case study!

Sign-up and get instant access!

 

Performance ExcellenceOptimized. Implemented.

Subscribe to Newsletter

Want to stay current with Implementation Engineers?
Enter your info below to receive our monthly newsletter.

Implementation Engineers®, Performance Analytix®, enCompass®, and Beyond Consulting® are registered trademarks of Implementation Engineers,
LLC in the United States (Reg. Nos. 4,532,275, 4,654,456, 4,643,370, 5,644,506)