Major steel producer exceeds lead time targets with one-piece flow implementation - Implementation

Major steel producer exceeds lead time targets with one-piece flow implementation

Case Studies

Major steel producer exceeds lead time targets with one-piece flow implementation

After partnering with Implementation Engineers (IE) on multiple engagements recently, our client looked to us again to help them increase output by ~50% from 3.5 tons to 5.0 tons. An initial operational review revealed two major bottlenecks:
1) excessive lead times in various steps in its process
2) more than 14,000 material coil processing paths.

Sign up to read the whole case study!

 

Sign-up and get instant access!

 

Performance ExcellenceOptimized. Implemented.

Subscribe to Newsletter

Want to stay current with Implementation Engineers?
Enter your info below to receive our monthly newsletter.

Implementation Engineers®, Performance Analytix®, enCompass®, and Beyond Consulting® are registered trademarks of Implementation Engineers,
LLC in the United States (Reg. Nos. 4,532,275, 4,654,456, 4,643,370, 5,644,506)