Developing an improvement journey for a mid-tier gold-producing mine in South America started with an operational analysis. An improvement to reduce the spot time during the load-haul cycle was among the primary initiatives. The result included new loading procedures and training.

Activities in this case study include:

  • Operational Analysis
  • Training and Exploration of New Loading Methods
  • Kaizen Event