Open pit gold mine targets 30-second reduction from spot time
Case Studies
Open pit gold mine targets 30-second reduction from spot time
Developing an improvement journey for a mid-tier gold-producing mine in South America started with an operational analysis. An improvement to reduce the spot time during the load-haul cycle was among the primary initiatives. The result included new loading procedures and training.
Activities in this case study include:
- Operational Analysis
- Training and Exploration of New Loading Methods
- Kaizen Event
Sign up to continue reading