UG Gold Mine changes improve productivity
Case Studies
UG Gold Mine changes improve productivity
With the threat of a shutdown looming, processes needed to change rapidly for a 30-year-old mid-size gold mine in Canada with open-pit and underground mining operations as well as a processing plant or mill.In the end, this mine and a sister mine were the only two operations in North America that weren’t shutdown or sold due to IE’s dramatic improvements that were started with this initiative.
Activities in this case study include:
- Operational Limit Study
- Value Stream Maps
- Historical Data Analysis
- Firsthand Observations
- Kaizen Event
Note: Sign-up for this case study and learn how a comprehensive analysis or operational limit study helped this company to achieve the results it was seekingand also get unlimited access to our entire library of case studies!
Note: Sign-up to download this case study!